My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/10/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 10/10/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:38:37 PM
Creation date
10/24/2017 2:20:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/10/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1081
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(the "Stage II Improvements"). The PERMITTEE must complete the construction <br />of the Stage II Improvements within one (1) year after the date upon which the Plat <br />is recorded. <br />PERMITTEE must install the Stage II Improvements in accordance with the <br />Plans. Per City Code Section 117-615, the PERMITTEE shall provide the CITY <br />with a set of re -producible as -built plans in Computer Aided Drafting (CAD) format <br />upon completion of the Stage II Improvements and acceptance by the CITY. As <br />as -built plans are a required Stage II Improvement item per City Code Section 117- <br />615, the CITY will not release the required Stage I Improvement Financial <br />Guarantee noted in paragraph #6 above until CITY has received the as -built plans. <br />Additionally, the PERMITTEE agrees to provide to the CITY the plans in CAD <br />format prior to the commencement of construction of the Stage II Improvements. <br />13. Financial Guaranty for Stae II Improvements. The CITY does not require a <br />financial guaranty to secure the PERMITTEE' S obligation to construct the Stage <br />II Improvements. <br />14. Warranty for Stae I and Stae II Improvements. The PERMITTEE shall provide <br />a one year warranty in the amount of 25% of the cost of the Stage I and Stage II <br />Improvements. Said warranty shall be in force for one year following the final <br />acceptance of any required improvements and shall guarantee satisfactory <br />performance of said improvement. The warranty must be in the form of a Letter of <br />Credit in a form acceptable to the CITY'S Finance Director or a cash escrow. <br />15. Street Improvements. The CITY shall plan and install the second lift of bituminous <br />pavement of Traprock Street NW and 146th Avenue NW which is immediately <br />adjacent to Lot 1 Block 1 of the Plat at a cost of $29,000.00. The PERMITTEE <br />shall be responsible for 50% of the total street improvement cost resulting in a fee <br />payable by the PERMITTEE to the CITY in the amount of ($14,500.00). <br />16. Street Cleaning and Clean Up.. After the street surfacing that is a part of the Stage <br />I Improvements is installed, the PERMITTEE shall clear any soil, earth, or debris <br />from the streets. From time to time, the CITY may remove accumulations of soil, <br />earth, and debris from the streets resulting from the construction of the Stage I <br />Improvements. It shall be the PERMITTEE'S responsibility to pay the costs <br />associated with this necessary street cleaning. Invoices from the CITY to the <br />PERMITTEE for such costs shall be paid within fifteen (15) days of the date of <br />the invoice. <br />17. Payment of Development Fee's. At the time of project closing, the PERMITTEE <br />must pay to the CITY the fees described on Exhibit B which may include, but are <br />not limited to, Park Land Dedication Fees, Trail Development Fees, Sanitary Sewer <br />Connection (Trunk) Fees, Water Connection (Trunk) Fees, Sanitary Sewer Lateral <br />Fees, Water Lateral Fees, Storm Management Fees, Street Light as well as Street <br />Light Operation and Maintenance Fees. <br />
The URL can be used to link to this page
Your browser does not support the video tag.