Laserfiche WebLink
OW t hi lon: To work together ko respotibiy grow oar community, and to provide quality, cost -affective, and efckent government tet does. <br />CC Regular Session 7. 8. <br />Meeting Date: 10/10/2017 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Information <br />Title: <br />Adopt Resolution #17-10-254 Accepting Bids and Awarding Contract for Improvement Project #17-10, Puma <br />Street Utility Extensions <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to consider adopting Resolution #17-10-254 accepting bids and awarding a construction <br />contract for Improvement Project #17-10, Puma Street Utility Extensions. <br />Background: <br />The proposed Puma Street utility extensions are needed to support the current Riverstone residential development, <br />as well as future development east of Puma Street and a smaller area west of the Riverstone development. This area <br />of the City is within the MUSA requiring service by City sewer and water. Attached is a copy of the title sheet of <br />the plans showing the general project location and scope of work. <br />The City recently extended trunk watermain and sanitary sewer along Bunker Lake Boulevard, east of Puma Street, <br />to serve the Riverstone development, as well as a portion of PSD's Bunker Lake Industrial Park. The trunk <br />watermain under Bunker Lake Boulevard is 16-inch ductile iron pipe (DIP), and the trunk sanitary sewer is 18-inch <br />polyvinyl chloride (PVC) pipe. <br />Puma Street was constructed with a temporary pavement section consisting of roughly 2 inches of bituminous <br />pavement over a few inches of aggregate base. Permanent street and trunk utility improvements were intended to be <br />constructed along Puma Street as adjacent properties developed. The temporary street section is proposed to be <br />improved in the spring/summer of 2018 after trunk utilities and services are installed this fall. <br />A portion of the south end of the Riverstone development will be served by the utilities previously extended along <br />Bunker Lake Boulevard. Phase IA in the attached Future Business Park Proposal addresses this. Public utilities <br />must be extended north along Puma Street to serve the remaining homes in the Riverstone development. In addition, <br />the Puma Street utility extensions will serve properties east of Puma Street, as well as the Northfork property just <br />west of the Riverstone development and south of Alpine Drive. Phase 1B in the attached Future Business Park <br />Proposal addresses this work. <br />An Assessment Agreement was recently executed between the City and two adjacent property owners. This will <br />allow the City to recover 40% of the project costs to extend utilities along Puma Street. The remaining 60% of the <br />costs will be paid from City sewer and water utility enterprise funds. City costs will be recovered over time through <br />trunk utility and connection fees. <br />Capstone Homes is currently constructing the Riverstone development. If the City Council accepts bids and awards <br />