My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/10/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 10/10/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:38:37 PM
Creation date
10/24/2017 2:20:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/10/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1081
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ryan Contracting Co. - $882,355.00 <br />Metro Utilities - $884,132.00* <br />Widmer Construction - $940,062.35* <br />Meyer Construction - $1,063,410.85 <br />* Pricing reflects a corrected summation of the unit prices bid multiplied by estimated quantities <br />shown on Bid Form. <br />The bid of Douglas -Kerr Underground, LLC of Mora, Minnesota, in the amount of $727,667.07 for the total bid for <br />construction of said improvements in accordance with the approved plans and specifications and advertisement for <br />bids, is the lowest responsible bidder. Their bid is $222,332.93, or 23.4%, less than the engineer's estimate of <br />$950,000. <br />Following award of contract, a Notice of Award will be issued to the awarded Contractor to initiate execution of a <br />contract and issuance of the required bonds and insurance. The City Attorney will verify that the contract, bonds, <br />and insurance are in proper legal form prior to execution of the contract. Once a contract is executed, a Notice to <br />Proceed will be issued and construction may then begin. At this time it is anticipated that construction will begin in <br />mid to late October. <br />A preconstruction meeting will be held before construction begins. Staff will contact the adjacent property owner to <br />provide an update on the proposed construction schedule and operations based on the Contractors input at the <br />preconstruction meeting. <br />Final completion is anticipated to occur by June 1, 2018. <br />The low bid submitted by Douglas -Kerr Underground, LLC, is $727,667.07. After adding indirect costs for <br />administrative (6%), engineering (15%), finance (1%), and legal (1%) costs, total project costs become <br />$895,030.50. <br />The improvements are proposed to be funded using a combination of bonds, special assessments to benefiting <br />properties, and stormwater utility funds. <br />In March 2017, Bolton Menk updated the Future Business Park report to include estimated costs for extending <br />trunk utilities along Puma Street, called Phase 1B improvements. A copy of the updated report is attached. The <br />report identifies estimated costs to extend trunk utilities along Puma Street with Phase 1B including trunk <br />watermain estimated costs of $182,000, and trunk sanitary sewer estimated costs of $545,000. This work totals <br />$727,000 and includes 30% contingency and indirect costs. This did not include costs to restore the surface of <br />Puma Street temporarily over the winter. Staff estimated these costs at $50,000. <br />Bolton & Menk proposed engineering fees to prepare plans and specifications at $104,780. The final invoice for <br />this work has not yet been received. Staff also proposes to utilize Bolton & Menk to administer the project and stake <br />construction. This work is estimated to cost $10,360 for construction staking and $9,776 for administration and lift <br />station related inspections. <br />City staff will inspect construction and assist with project administration. City project costs not covered by other <br />parties through the Assessment Agreement are proposed to be paid through City sewer and water utility funds. <br />NTI will perform construction materials testing. This work is estimated to cost $5,000. <br />Connexus needs to provide power to the lift station which is not included in the bids. This work is estimated to cost <br />$20,000 to $30,000, depending on chosen route. <br />Recommendation: <br />
The URL can be used to link to this page
Your browser does not support the video tag.