Engineer of that part of work in progress that RPR believes should be corrected or rejected or <br />should be uncovered for observation, or requires special testing, inspection or approval. <br />9. Inspections, Tests, and System Start-ups: <br />a. Verify that tests, equipment, and systems start-ups and operating and maintenance training are <br />conducted in the presence of appropriate Owner's personnel, and that Contractor maintains <br />adequate records thereof. <br />b. Observe, record, and report to Engineer appropriate details relative to the test procedures and <br />systems start-ups. <br />10. Records: <br />a. Prepare a daily report or keep a diary or log book, recording Contractor's hours on the Site, <br />Subcontractors present at the Site, weather conditions, data relative to questions of Change <br />Orders, Field Orders, Work Change Directives, or changed conditions, Site visitors, deliveries of <br />equipment or materials, daily activities, decisions, observations in general, and specific <br />observations in more detail as in the case of observing test procedures; and send copies to <br />Engineer. <br />b. Record names, addresses, fax numbers, e-mail addresses, and telephone numbers of all <br />Contractors, Subcontractors, and major Suppliers of materials and equipment. <br />c. Maintain records for use in preparing Project documentation. <br />11. Reports: <br />a. Furnish to Engineer periodic reports as required of progress of the Work and of Contractor's <br />compliance with the Progress Schedule and schedule of Shop Drawing and Sample submittals. <br />b. Draft and recommend to Engineer proposed Change Orders, Work Change Directives, and Field <br />Orders. Obtain backup material from Contractor. <br />c. Immediately notify Engineer of the occurrence of any Site accidents, emergencies, acts of God <br />endangering the Work, force majeure or delay events, damage to property by fire or other <br />causes, or the discovery of any Constituent of Concern or Hazardous Environmental Condition. <br />12. Payment Requests: Review applications for payment with Contractor for compliance with the <br />established procedure for their submission and forward with recommendations to Engineer, noting <br />particularly the relationship of the payment requested to the Schedule of Values, Work completed, <br />and materials and equipment delivered at the Site but not incorporated in the Work. <br />13. Certificates, Operation and Maintenance Manuals: During the course of the Work, verify that <br />materials and equipment certificates, operation and maintenance manuals and other data required <br />by the Contract Documents to be assembled and furnished by Contractor are applicable to the items <br />actually installed and in accordance with the Contract Documents, and have these documents <br />delivered to Engineer for review and forwarding to Owner prior to payment for that part of the Work. <br />Supplementary Conditions <br />00 73 00-5 <br />