My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/10/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 10/10/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:38:37 PM
Creation date
10/24/2017 2:20:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/10/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1081
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. The person performing the inspection in paragraph (D) above, shall be required to make a daily log. This log <br />shall also include the date and time any changes in the stages, phases, or portions thereof go into effect. The <br />log shall identify the location and verify that the devices are placed as directed or corrected in accordance <br />with the Plan. All entries in the log shall include the date and time of the entry and be signed by the person <br />making the inspection. The Engineer reserves the right to request copies of the logs as he deems necessary. <br />The Contractor shall be required to provide copies of the inspection logs, within the time frame agreed upon, <br />when requested by the Engineer. If the Contractor is negligent in providing the inspection logs within the <br />time frame agreed upon, the Contractor shall be subject to an hourly charge assessed at a rate of $250.00 <br />per hour for each hour or any portion thereof with which the Engineer determines that the Contractor has <br />not complied. <br />F. Measurement and Payment: <br />All traffic control required under this Contract shall be paid per the Traffic Control quote items provided on <br />the Quote Form. <br />1.02 MAINTENANCE AND STAGING OF TRAFFIC CONTROL <br />A. The Contractor shall maintain, at all times, traffic movement and local access. Traffic may be restricted to one <br />lane with proper signing and flagging. <br />PART 2 — PRODUCTS (Not used) <br />PART 3 — EXECUTION (Not used) <br />Division 1 — General Requirements <br />DV1-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.