Laserfiche WebLink
SECTION 3122 00 <br />GRADING <br />PART 1 — GENERAL <br />1.01 SECTION INCLUDES <br />A. Rough Grading. <br />B. Finish grading. <br />1.02 RELATED SECTIONS <br />A. Section 3125 00 — Erosion and Sedimentation Control. <br />B. Section 3123 33 —Trenching and Backfilling. <br />1.03 PROJECT CONDITIONS <br />A. Protect above- and below -grade utilities that remain. <br />B. Protect plants, lawns, trees, and other features to remain as a portion of final landscaping. <br />C. Protect items not intended for removal. <br />PART 2 - PRODUCTS <br />2.01 MATERIALS <br />A. On -Site Soil <br />PART 3 - EXECUTION <br />3.01 EXAMINATION <br />A. Verify that survey bench mark and intended elevations for the Work are as indicated. <br />3.02 PREPARATION <br />A. Identify required lines, levels, contours, and datum. <br />B. Stake and flag locations of known utilities. <br />C. Locate, identify, and protect utilities that remain, from damage. <br />3.03 ROUGH GRADING <br />A. Remove topsoil from areas to be further excavated, re -landscaped, or re -graded, without mixing with foreign <br />materials. <br />B. Do not remove topsoil when wet. <br />C. Remove subsoil from areas to be further excavated, re -landscaped, or re -graded. <br />Division 31— Earthwork <br />DV31-1 <br />