Laserfiche WebLink
SECTION 3123 33 <br />TRENCHING AND BACKFILLING <br />PART 1- GENERAL <br />1.01 SCOPE OF WORK <br />A. This Work consists of trenching, backfilling and compacting operations associated with removal of pipe, <br />structures and other appurtenances incorporated with Project. <br />B. Work shall be completed in accordance with Standard Specifications except as herein modified and as shown <br />on Plans <br />1.02 RELATED WORK <br />A. Section 02 4100 — Building Demolition and Removal. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION <br />3.01 TRENCHING AND BACKFILLING <br />A. Contractor shall refer to CEAM Standard Specifications Section 2600 for all trenching and backfilling <br />operations. <br />3.02 COMPACTING <br />A. Contractor shall refer to CEAM Standard Specifications Section 2600 and MN/DOT Standard Specifications <br />Section 2105.3F1 for compaction requirements. <br />3.03 METHOD OF MEASUREMENT <br />A. This work shall be incidental to other work and no measurement will be made. <br />END OF SECTION <br />Division 31— Earthwork <br />DV31-4 <br />