My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/10/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 10/10/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:38:37 PM
Creation date
10/24/2017 2:20:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/10/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1081
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 3123 33 <br />TRENCHING AND BACKFILLING <br />PART 1- GENERAL <br />1.01 SCOPE OF WORK <br />A. This Work consists of trenching, backfilling and compacting operations associated with removal of pipe, <br />structures and other appurtenances incorporated with Project. <br />B. Work shall be completed in accordance with Standard Specifications except as herein modified and as shown <br />on Plans <br />1.02 RELATED WORK <br />A. Section 02 4100 — Building Demolition and Removal. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION <br />3.01 TRENCHING AND BACKFILLING <br />A. Contractor shall refer to CEAM Standard Specifications Section 2600 for all trenching and backfilling <br />operations. <br />3.02 COMPACTING <br />A. Contractor shall refer to CEAM Standard Specifications Section 2600 and MN/DOT Standard Specifications <br />Section 2105.3F1 for compaction requirements. <br />3.03 METHOD OF MEASUREMENT <br />A. This work shall be incidental to other work and no measurement will be made. <br />END OF SECTION <br />Division 31— Earthwork <br />DV31-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.