CC Regular Session 4. 10. <br />Meeting Date: 10/10/2017 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Information <br />Title <br />Adopt Resolution # 17-10-255 Accepting Quotes and Awarding Contract to Repair Stormwater Pond Erosion at <br />7550 Highway 10 NW <br />Purpose/Background: <br />Purpose <br />The purpose of this case is adopt Resolution #17-10-255 accepting quotes and awarding contract to repair <br />stormwater pond erosion at 7550 Highway 10 NW <br />Background: <br />The City of Ramsey constructed the pond on 7550 Highway 10 NW in 2014 as part of the Riverdale Drive <br />Extension/Reconstruction project, Improvement Project #12-22. This pond was constructed to replace stormwater <br />pond capacity that was lost when Riverdale Drive was extended to Traprock Street. Attached is an aerial image <br />showing the existing stormwater ponds in this area, including the pond on the 7550 Highway 10 property, which is <br />located on private property but is encumbered by a drainage easement to allow the City, and Anoka County, access <br />to this pond. <br />As part of the development of the Riverdale Drive project, several agreements were executed between the owners <br />of the private properties in this area, the City of Ramsey, and Anoka County. These agreements set forth the work <br />that was completed at the time, and they defined the dedicated easements that allow for future maintenance of the <br />ponds. The City of Ramsey is responsible for maintaining all ponds in this area, including the pond on 7550 <br />Highway 10 NW. <br />Staff has been tracking the erosion in this pond for a while, but due to the recent heavy rains, this erosion now <br />needs to be repaired to allow the pond to function as it was designed to. Staff therefore requested quotes from three <br />contractors to re -grade the pond to restore storage capacity of the pond and re-establish side slopes, including an <br />access road on the south side slope. Work is proposed to include cleaning the eroded material out of the bottom of <br />the pond and re -shaping the side slopes, applying 3 inches of salvaged topsoil on all exposed side slopes, seeding <br />the topsoil with dormant seed, and installing erosion control blanket on the side slopes to protect the slopes and seed <br />until such time that the seed germinates. If the seed does not germinate by spring of 2018, the contractor will have <br />to reseed and blanket in the spring of 2018. <br />Quotes from the three contractors are shown below. <br />Contractor <br />Reshetar Systems <br />Kamke Contracting <br />Douglas -Kerr Underground, LLC <br />Total Quote <br />$33,250 <br />$33,350 <br />$47,325 <br />Reshetar Systems quote is the lowest for said improvements. The awarded Contractor will be required to be licensed <br />by the City to ensure they are maintaining minimum insurance coverages. All work shall be carried out during <br />normal working hours from 7:00 a.m. to 10:00 p.m., Monday through Saturday, in accordance with City <br />ordinances. <br />