My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/10/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 10/10/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:38:37 PM
Creation date
10/24/2017 2:20:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/10/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1081
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Ramsey <br />Project B1700969 <br />March XX, 2017 <br />Page 4 <br />DRAFT <br />■ Installed five temporary monitoring wells in five of the soil borings (S-1, S-4, S-6, S-8, and S-9) <br />and collected groundwater samples. <br />■ Installed three temporary soil vapor probes (SG-1 through SG-3) and collected soil vapor <br />samples. <br />■ Conducted environmental monitoring during drilling and screened soil samples collected <br />from the borings for the presence of organic vapors using a photoionization detector (PID). <br />Visual and olfactory observations regarding potential contamination were also made and <br />recorded. <br />■ Analyzed representative samples of soil, vapor, and groundwater for one or more of the <br />following parameters: Volatile organic compounds (VOCs), polycyclic aromatic hydrocarbons <br />(PAHs), gasoline range organics (GRO), diesel range organics (DRO), and Resource <br />Conservation and Recovery Act (RCRA) metals. <br />■ Evaluated the data and prepared this report. <br />Investigation locations are shown on Figure 2 and soil boring logs are included in Appendix A. <br />D. Deviations from Work Plan/Proposal <br />The proposal included 12 soil borings: 5 to be completed as temporary monitoring wells and 7 to be <br />advanced by the former fueling dispensers. However, sampling under the dispensers was conducted as <br />part of the concurrent tank removal activities. Instead of the 7 dispenser borings, 4 shallow (8 feet deep) <br />soil borings were advanced for general coverage of the Site. <br />E. Investigation Methods and Procedures <br />The field work relating to the Phase II ESA investigation was conducted on March 13, 2017. Prior to <br />beginning the field investigation, public utilities were cleared through Gopher State One Call and private <br />utilities were cleared through a subcontracted private utility locator. <br />Soil boring rationale and analytical testing parameters are summarized in Section E.1.c. The locations and <br />ground surface elevations of soil borings, temporary monitoring wells, and soil vapor probes were <br />BRAUN <br />INTERTEC <br />
The URL can be used to link to this page
Your browser does not support the video tag.