My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/10/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 10/10/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:38:37 PM
Creation date
10/24/2017 2:20:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/10/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1081
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Ramsey <br />Project B1700969 <br />March XX, 2017 <br />Page 7 <br />DRAFT <br />E.2.a. Temporary Monitoring Wells <br />After the soil borings were advanced about 2 feet into the water table, temporary monitoring wells were <br />constructed using 1-inch-diameter PVC riser and a 5-foot long, 10-slot screens. Following well use, the <br />well materials were removed, and the boreholes were sealed in accordance with applicable code <br />requirements. <br />E.2.b. Groundwater Analyses <br />Groundwater samples collected from the temporary wells were submitted to Pace Analytical Services of <br />Minneapolis, Minnesota and analyzed for the following parameters: <br />■ VOCs using EPA Method 8260 <br />■ DRO using the WDNR Method <br />E.3. Soil Vapor Evaluation <br />E.3.a. Soil Vapor Probes <br />Three temporary soil vapor probes (SG-1 through SG-3) were advanced, using a hydraulically -driven <br />push -probe rig, to a depth of 5 feet bgs and then retracted to a depth of 4 feet bgs. New, inert tubing <br />was attached to the top of the downhole sampler, and the sampling point and tubing were purged with a <br />hand pump to remove two volumes of air prior to sample collection. Following purging, organic vapor <br />concentrations were screened with a PID and the value was recorded. The soil vapor samples were then <br />collected using laboratory -supplied negative pressure air -sample collection canisters (6-liter canisters) <br />equipped with 200 milliliter per minute (mL/min) flow restrictors in accordance with the MPCA <br />guidelines. Following sample collection, the temporary sampling point was removed from the borehole, <br />and the borehole was sealed in accordance with MDH guidelines. <br />The soil vapor samples were submitted to Pace Analytical Services of Minneapolis, Minnesota and <br />analyzed for VOCs using EPA Method TO-15. <br />BRAUN <br />INTERTEC <br />
The URL can be used to link to this page
Your browser does not support the video tag.