Laserfiche WebLink
Park Improvements <br />E <br />0 <br />E <br />c. <br />— <br />Project Name Irrigation for Titterud Park <br />r‘i <br />Park Improvement <br />L. <br />0 <br />4-New Addition (Med) <br />Status Ac <br />r-- <br />0 <br />r/2 <br />Underground irrigation & 160 GPM <br />If municipal water is available. cost may be less. <br />Justification <br />VI <br />.a.' <br />0 <br />V) <br />0 <br />7-4 <br />0.< <br />a.) <br />i--, <br />a a a I a a <br />o a <br />- <br />a T3 a <br />c:. <br />o <9 <br />Ta <br />C5 4.< cci* ce r.- co <br />N <br />N. <br />kr) 2 0 <br />o <br />H <br />00 IN IN <br />c3 CV fl <br />g 0 <br />N.1 0 <br />PA <br />(0 <br />9 <br />0 ,./0 <br />.-0 el el <br />0 c= <br />o el el <br />f:n <br />0 <br />t./ 0 0 0 C:, <br />o en o c::. rn o c <br />g c0 • r- t•-• C0 r- t•-• <br />0 <br />o e'l el <br />') ,.) <br />$. <br />0) <br />el el <br />5 el el <br />0 0 <br />el el <br />c0 <br />0 <br />0 <br />0 <br />4-, <br />g el el <br />0 0 <br />"CG <br />7 el el <br />o <br />cn <br />..... <br />ri) <br />el el <br />o <br />t <br />a, <br />A 160 GPM well may cost about $26,000. <br />00 <br />Expenditures <br />0 <br />10 <br />11) <br />0 <br />0) <br />a) 0 <br />E <br />ID cr) <br />> <br />2 'Es <br />= <br />_E co= <br />a <br />E- <br />el <br />00 <br />,•••1 <br />Funding Sources <br />