My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 11/09/2017
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2017
>
Agenda - Parks and Recreation Commission - 11/09/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:54:05 PM
Creation date
11/3/2017 12:57:37 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
11/09/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Required Improvements <br />For approximately two decades, developers (residential, as well as commercial/industrial) have been required to <br />pave a trail along any arterial streets or roadways in the City, as part of basic infrastructure. The same with <br />sidewalks along at least one side of the street for those areas within the residential Urban Service Area. These two <br />elements of infrastructure are not eligible for Park Dedication or Trail Fee credit, but shall be required to be <br />installed as a Stage 1 improvement of the plat. <br />The Commission will note a small passive area of open space within the proposed subdivision, as well as internal <br />trails within the proposed plat. These are not credit eligible, and at this time, it is not known if the trails would be <br />closed for public use. <br />Funding Source: <br />The Developer will be responsible for the costs of construction of all infrastructure internal to the site. <br />Recommendation: <br />Staff recommends that Park Dedication and Trail Fees consist of a cash contribution per lot, less the 16 units for <br />which these development fees have been previously satisfied, in an amount specified at the time of platting. <br />Action: <br />Motion to recommend to City Council, that Park Dedication and Trail Fees consist of a cash contribution per lot, <br />less the 16 units for which these development fees have been previously satisfied, in an amount specified at the time <br />of platting. <br />Site Location Map <br />Open house on proposed park <br />Park plans west of Armstrong <br />Sketch Plan <br />Trail along Alpine Dr <br />Comprehensive Plan - Land Use Plan <br />Staff Review Letter <br />Citv Code Section 117-112 <br />Exhibit <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Tim Gladhill NlaryJo Warner 11/03/2017 10:17 Ail <br />Form Started By: Dlark Riverblood Started On: 11/01/2017 11:30 Ai l <br />Final Approval Date: 11/03/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.