My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Economic Development Authority - 11/09/2017
Ramsey
>
Public
>
Agendas
>
Economic Development Authority
>
2017
>
Agenda - Economic Development Authority - 11/09/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:15:12 PM
Creation date
11/6/2017 4:07:49 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Economic Development Authority
Document Date
11/09/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOLTON <br />& MENK <br />Real People. Real Solutions. <br />October 11, 2017 <br />Mr. Patrick Brama <br />Economic Development Manager <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, Minnesota 55303 <br />RE: City of Ramsey COR Analysis <br />Dear Mr. Brama: <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />In reviewing the COR Development Plan dated 5/15/2012, combined with development that has occurred <br />since 2012, there appear to be several components the City may want to analyze further: <br />• Existing roundabout at Sunwood Drive and Ramsey Parkway, <br />• Bunker Lake Boulevard, <br />• Center Street realignment, <br />• Center Street intersection at Ramsey Parkway, <br />• Zeolite Street, <br />• Yolite Street, <br />• Peridot Street, <br />• Veterans Drive, <br />• Veterans Drive parking options, <br />• Earth work calculations (area south of Bunker Lake Blvd., north of Sunwood Dr., west of <br />Center Street, and east of Armstrong Blvd.), and <br />• Public utilities (review existing/planned future sanitary sewer, watermain, and storm water <br />sewer facilities to help ensure cost-effective development). <br />The COR area generally developed from the edges towards the center. Taking a step back to make sure <br />the final pieces fit together appears to be a responsible next step by the City. <br />We have prepared the following scope of services based on adding a series of tasks to our current <br />analysis. We essentially will review the entire COR area, with a heavier focus on the undeveloped <br />portions. <br />SCOPE OF SERVICES <br />The expanded work scope includes: <br />• Receive all record drawings, GIS information and other date the City has on file for developed <br />properties, public infrastructure and previous studies in the COR area. <br />• Create a base drawing based on plats, aerial photography and other information available from <br />the City. <br />H:\RAMS\R16114924\Ramsey Center Street Proposal\Ramsey COR Area Analysis 10112017.docx <br />Bolton & Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.