My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 08/04/1992
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
1992
>
Agenda - Planning Commission - 08/04/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 4:03:48 PM
Creation date
11/13/2017 11:31:25 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
08/04/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE # 1 <br />REQUEST FOR SKETCH PLAN REVIEW OF BURY AND CARLSON <br />ADDITION, A MINOR SUBDIVISION; CASE OF BURY AND CARLSON <br />By: Zoning Administrator Sylvia Frolik <br /> <br />Background: <br /> <br />Btu, fy and C~arlson is requesting sketch plan review of a minor subidivison in the Business <br />Warehouse District. The area to be platted is approximately 17 acres and consists of two metes and <br />bounds desaS~ 'b _~ parcels and Outlot A of Gateway North Industrial Park. The property would be <br />platted into 0ne:lot and if approved, Bury and Carlson is proposing to establish their cement and <br />asphalt rubble processing facility on the site. Bury and Carlson are also proposing to acquire <br />Outlots B and Cof Gateway North Industrial Park, but these properties will not be brought into the <br />plat. <br /> <br />The following items are enclosed for your review: <br /> <br />a) <br />b) <br />c) <br /> <br />Site location map <br />Proposed sketch plan <br />City Staff review letter dated July 16, 1992 <br /> <br />O bse rva t i'o,n s: <br /> <br />The proposed lot in the plat meets the minimum area and dimension requirements for the Business <br />Warehouse Dism_'ct. No construction of roads interior to the plat are required. The one lot in the <br />plat will receive~ access from Jaspar Street N.W. The ponding area on the plat proposed to be <br />designated as Oatlot A should be changed to 'drainage easement'. <br /> <br />Three sides of the old Foster cemetery are encompassed by the plat and the City should be <br />provided access to the cemetery. It is also reasonable to expect that 143rd Avenue would be <br />extended to the east at some point in the future. City Staff review letter dated July 16, 1992, <br />includes reeo~rrtendations for a 33 foot wide outlot along the northern boundary of the plat and an <br />easement frofl~ the northeast comer of the plat south to the cemetery to provide the City with access <br />to the cemet{~ry,' It is proposed that the development agreement for the plat will require the <br />developer tO '_,deed the outlot along the northern boundary of the plat, at no expense, to the City at <br />such time as It b~comes necessary to extend 143rd. In the interim, an easement along the outlot <br />and the ease~ent~from the northeast corner of the plat south to the cemetery will provide the access <br />to that cemetery. <br /> <br />Although Outlot B, Gateway North Industrial Park will not be brought into the plat, it is apparent <br />that it was platted as such to provide a link in the planned collector sa-eet connecting Sunfish Lake <br />Blvd. N.W. and Ramsey Blvd. N.W. <br /> <br />Recommendation: <br /> <br /> Commission Action: <br /> <br /> Motion to; <br /> RecOmmend that City Council grant final plat approval to Bury and Carlson Addition, a <br /> minor subdivision. <br /> <br />Review Checklist: <br /> <br />?&Z: 814192 <br /> <br />City Administrator <br />City Engineer <br />Zoning Administrator <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.