Laserfiche WebLink
uses ever erase for a period exceeding 6 consecutive months, they may not be re-established <br />without a ¢6nditional use permit. The City aggressively supports their eventual removal as <br />proposed by ihe applicant. <br /> <br />The total square footage of the existing and proposed structures is within the 35% lot coverage <br />requirement.: <br /> <br />The site plan does not provide dimensions to show that all proposed construction will meet the <br />setback requ';~ements for the B-3 Highway Business District. <br />Following Ci. ty Code to the letter, the existing and proposed uses should be providing as many as <br />60 off-street ~arldng spaces when all phases of the development are complete. The site plan has <br />scaled off 19[off-street parking spaces. Additional spaces could be gained by scaling off parking <br />spaces in th6 fenced area which is providing required parking for the auto repair and auto body <br />businesses. The f'mai determination on the number of off-street parking spaces to be provided will <br />be a matter for discussion by the Planning Commission. <br /> <br />The site is aurrently served by two accesses onto Highway #10. It is the City Engineer's <br />recommendation 'that these two accesses be merged into one as part of the City's goal to reduce the <br />number of accesses onto the highway. <br /> <br />By the time ~e Planning Commission meets on October 5, the applicant will have already installed <br />concrete curbing along the front of the site and overlaid the existing pavement on the site. Phase I <br />of the expansion will require paving the driveway to the auto repair shop expansion area on the <br />west side of ihe strip center, the secured parking area in the northeast comer of the site and at <br />minimum, a driveway to the secured parking area. Phase II will require paving the balance of the <br />traffic maneu, venng area in front of the two suites to be added to the center. The applicant is <br />seeking a 21year time frame, versus the standard 1 year, to complete the required site <br />improvemenB. The outer perimeters of these paved areas are to be finished with continuous <br />concrete curbing. <br /> <br />Some of the additional parking spaces required can be accounted for by scaling off the secured <br />parking area ~ the northeast comer of the site as this area is providing required parking for the auto <br />repair businesses. Because of theft and vandalism problems, the applicant is proposing to fence <br />this area in. ~A combination of privacy fencing and chain link fencing will be used to provide <br />screening froth Hwy. #10 and visibility into the area to officers on patrol. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The site is presently served by on-site septic and well. The site plan should be modified to indicate <br />the location of these services to support that expansion will not impact these utilities. As with past <br />policy, the de~,elopment permit will be drafted to obligate the property owner to participate in a <br />petition, if and when it is presented, for a feasibility study to extend municipal utilities to the <br />property. <br /> <br />The only lan~caping proposed is along the south end of the proposed body shop delivery/estimate <br />center and betp0veen the existing strip center and its Phase I1 expansion area. The types of plantings <br />to be established have not been indicated on the site plan. If area permits, some unobstructive <br />plantings should also be established along the front of the site. <br /> <br />The exterior f~tcing on the strip center has recently been replaced with stucco. The expansions to <br />the strip cent. et will also be faced with stucco. The auto body accessory building is proposed to be <br />faced with lag siding. This is in conformance with City Code. The applicant has also expended a <br />great deal of time and expense removing accumulated debris from the property. <br /> <br />Staff is requesting that a grading plan be provided to avoid 'bird baths' in the pavement. <br /> <br /> <br />