Laserfiche WebLink
MATERIALS ESTIMATE FOR HIGHWAY #10 SERVICE ROAD <br /> <br />Right-of-Way: <br /> <br />Linear Total: <br />Area Total: <br /> <br />45.0 feet <br /> <br />3,665 feet <br /> 164,925 square feet or 3.79 acres <br /> <br /> 26.0 feet <br /> <br />Mat Width: <br />Area -- 3,665 x 26 = 95,290 Square Feet <br /> 1 cubic foot bituminous-- 160 <br /> 95,290 x 3" (.25) -- 23,822.5 Cu. Ft. X 160 lbs. <br /> W = 3,811,600\2,000 -- 1,905.8 tons <br /> 1,905.8 tons x $25 [ ton ~- $47,645.00 <br /> A -- 95,290 Sq. Ft. <br /> '7 Cu. Ft. Class V -- 120 <br /> 95,290 x .5" = 47,645 Cu. Ft. X 120 lbs. <br /> 2,858.7 tons x $6 / ton = $17,152'00 <br /> Total Cost of Materials $64,797.00 <br /> <br />Overhead- 30% <br />Total Project Cost - $84,236.10 <br /> Cost / Linear Feet - $22.98 [ Pt. <br /> <br /> <br />