My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Council - 11/09/2004
Ramsey
>
Public
>
Minutes
>
Council
>
2004
>
Minutes - Council - 11/09/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:55:47 PM
Creation date
11/30/2004 11:04:22 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Council
Document Date
11/09/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
authorization of the design of all 'these improvements by Hakanson Anderson Associates, Inc. <br />with design fees not to exceed $105,500. This cost does not include the bridge design, which <br />could bc close to $50,000 in itself. <br /> <br />Councilmember Strommen questioned if it is being proposed to go ahead with the feasibility <br />study and the design of Phase II,, but the actual: construction would not go forward until the <br />conditions laid out in the Master Development Agreement are completed. <br /> <br />Assistant Public Works Director Olson replied the !construction would not be completed until the <br />conditions of the Master Development Agreement are satisfied, or there is further clarification <br />and a public hearing is held. To do the assessments they would have to go forward with the <br />assessment procedure. <br /> <br />Councihnember Strommen asked what year Was slated for Phase II improvements. <br /> <br />Assistant Public Works Director Olson replied the improvements were planned for 2006 or 2007. <br />The full build out of Town Center Was anticipated by 2007 in the initial phasing of this project. <br /> <br />Councilmember Strommen stated they should be certain that they are aware of any financial <br />impact of moving the timeline faster than they had anticipated. So there are not Phase II bonds <br />on top of Phase I bonds. <br /> <br />Assistant Public Works Director Olson replied these comments will be incorporated into the <br />feasibility study. <br /> <br />Councilmember Cook noted tonight they passed wOrdage for going on with an amendment to the <br />Master Development Agreement, which says they ;may be phasing these Phase II improvements <br />in a different way, and they need to know what'they will be getting into before they start that <br />phasing. ~ <br /> <br />Assistant Public Works Director Olson replied they agreed to negotiate on the construction of the <br />Phase II roadways, but that does not stipulate a:timeline. He advised Sapphire Street and this <br />connection is essential soon. The design of Segment one is necessary shortly, but a good deal has <br />been done with the Third Addition, so the cost is not very high for the final design. He did not <br />feel it was prudent to construct the segrnentsofroad and put cul-de-sacs on both ends, when they <br />only had to go a little longer and connect the loop 'and create another avenue for traffic to get to <br />the bus stop. The bottom line is he has asked for approval to do the final design, as it cannot hurt <br />to have the information when development proposals come forward. However, at the very <br />minimum the total design cost of $56,900 outlined on page 353 is needed. <br /> <br />Councilmember Elvig stated the conversation about~ the timing is prudent, as if they stretch things <br />too far out the tax base will not be there. He asked where the funding would come from. <br /> <br />Assistant Public Works Director Olson replied the funding would be from the Interfund Loan <br />until the bonding is completed. <br /> <br />City Counci,l/NoVe;mber 9, 2004 <br /> Page ~25 ,of 31 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.