Laserfiche WebLink
Name: Patrick Brama, City of Ramsey <br />Date: September 19, 2017 <br />Page: 2 of 2 <br /> <br />areas is $10,119,600, which includes a 20% contingency for unforeseen improvements that may be <br />needed for the system. Dividing the total costs by the total connections yields a value of $2,213. <br />th <br />The total of all of the undeveloped areas within the City, EXCLUDING the 167 Area, has the potential <br />of an additional 3984 RECs. The estimated present day costs of all improvements needed to serve these <br />areas is $8,343,600, which includes a 20% contingency for unforeseen improvements that may be needed <br />for the system. Dividing the total costs by the total connections yields a value of $2,094. <br />th <br />Based on this analysis, the connection charge increases in the range of 5% with the inclusion of the 167 <br />Area connections and improvements. <br /> <br />