My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 11/21/2017
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2017
>
Agenda - Public Works Committee - 11/21/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:14:51 AM
Creation date
11/17/2017 8:50:52 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
11/21/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2040 MUSA - Water System Loop Improvements (2021-2040) <br />SIZELENGTH COST PER <br />LoopLOCATIONCOST <br /> (IN.)(FT.)FOOT* <br />Southwest Loop12"19,000$124$2,352,313 <br />1 <br />3,000 LF Constructed in 2017 <br />TOTAL LOOP 1$2,352,313 <br />North Central Loop12"28,000$124$3,466,567 <br />2 <br />TOTAL LOOP 2$3,466,567 <br />County Road 5712"4,100 <br />3INCLUDED IN YEAR 2020 OF CIP <br />CSAH 5/157TH AVE NW12"2,700$124$334,276 <br />4 <br />TOTAL LOOP 4$334,276 <br />158TH LANE NW12"3,400$124$420,940 <br />5 <br />TOTAL LOOP 5$420,940 <br />RIVERDALE BOULEVARD12"2,300 <br />6INCLUDED IN YEAR 2017 OF CIP <br />SUB-TOTAL$6,574,097 <br />20% CONTINGENCIES FOR UNFORSEEN IMPROVEMENTS$1,314,819 <br />TOTAL IMPROVEMENT COSTS$7,888,916 <br />AVERAGE YEAR FOR 20 YEARS (2017 DOLLARS)$394,446 <br />INFLATED AT 3% PER YEAR TO YEAR 2021$443,952 <br />* INCLUDES 25% INDIRECT COST <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.