My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/28/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 11/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:39:42 PM
Creation date
11/27/2017 8:47:41 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/28/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
381
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOLAR COLLECTION, INVERTERS, AC COLLECTION, AND TRANSFORMERS <br />The PV modules will be electrically connected into a series of strings. A string inverter will be <br />installed for each string located throughout the solar field. The module strings will be wired to <br />string inverters (DC -to -AC conversion equipment) on the SGF site. <br />The inverter output power cables will be combined in five distributed AC panel boards located <br />throughout the SGF. The outputs of the AC panels will be combined at a centrally located AC <br />switchgear station installed on a concrete pad. A step-up transformer will also be located at this <br />central location and the output of the transformer will feed to the utility, Connexus Energy. <br />Underground electrical cables will be installed in PVC (polyvinyl chloride) conduit using ordinary <br />trenching techniques, which includes excavation of trenches to accommodate PVC conduit. The PVC <br />electrical conduits and wires will be installed at varying depths across the SGF. The depths for the <br />PVC conduit and trench backfill will be in accordance with local, state, and federal codes. The AC <br />energy will be stepped up to the appropriate interconnection voltage by the system transformer to <br />match the voltage at the grid interconnection. Required switchgear cabinetry will be provided as <br />necessary for circuit control. The electrical inverters will be H- frame mounted and the AC collection <br />panel, switchgear, and step-up transformers will be placed on poured concrete foundations. <br />SGF INTERCONNECTION DESCRIPTION <br />Each inverter will be outdoor rated and mounted on a steel, rigid frame. The AC output of the <br />inverters will be fed to the distributed AC panel boards. The AC collection system cables will be <br />connected in parallel and collected at the site switchgear. The switchgear includes the main circuit <br />breaker and utility metering equipment. It will be enclosed separately but pad -mounted together <br />with the set-up transformer. <br />GENERATOR -TIE LINE <br />The power generated by the SGF will be connected to the existing Connexus Energy network using <br />the voltage transformation equipment and system safety equipment to be constructed at the SGF. <br />Timeline for Decommissioning Plan <br />As stated above, the proposed SGF will operate for no less than 25 years. After operations cease at <br />the facility, equipment removal will take approximately one month, and reclamation will take an <br />additional two weeks. <br />Removal of Hazardous Materials <br />Based on the use of the site, hazardous materials will not be present in significant quantities and the <br />risk of spill or release is considered low. Once the SGF ceases operations, all potential hazardous <br />materials (i.e., transformer coolant) and wastes (i.e., broken PV panels) will be removed from the <br />site and disposed of in accordance with local, state, and federal laws. <br />