Laserfiche WebLink
Contouring, Erosion, and Sediment Control <br />Contouring the site will be conducted using standard grading and farming equipment to return the <br />land to approximately match the pre -construction surface conditions. All aggregate base will be <br />removed from access roads and removed from the site, as required. The site drainage features will <br />be restored to their pre -construction condition. Temporary erosion and sediment control measures <br />such as sediment fences, hay bales, mulch, and soil stabilizers and other best management practices <br />will be used as needed. As noted above, the pre -construction site conditions will be recorded prior to <br />beginning construction for the SGF. <br />Types of Crops to be Planted <br />After reclamation of the site, the type of crop(s) to be planted will be determined by then- prevailing <br />market conditions. Details of ground treatments, erosion control, fertilization, planting methods, <br />weed control, and irrigation systems will be added to the plan, once the crops are selected. This <br />information will be summarized in a revised version of this decommissioning plan before it is <br />implemented. <br />