My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/14/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 11/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:39:23 PM
Creation date
11/27/2017 9:25:25 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/14/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
686
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
date of payoff, which amount shall be paid by RTC. The assessments on this part <br />of Outlot U are as follow: <br />1. Phase I Roadway Improvements: $52,562.00. <br />2. Phas II Roadway Improvements: $30,899.00. <br />3, AUAR Roadway Improvements: $180,000.00. <br />4. Municipal Parking Improvements: S360,000.00. <br />TOTAL $623.451.00 <br />c. Reconciliation of' Outlot B. It has been determined by the CITY that there was an <br />error in the area calculation for computing the assessments due on part of Outlot <br />B, which assessments were collected at the June 15, 2005, closing between D.R. <br />Horton and K. Hovanlan T&C Homes at Minnesota, LLC. The area calculation <br />has been adjusted and the remaining assessment due on part of Outlot B is Forty <br />Thousand Five Hundred Forty Eight dollars and Seventeen Cents ($40,548.17) <br />(principal of $39,485.00, plus interest in the amount of $1,063.17 at a rate of 6.3% <br />per annum from February 22, 2005 until July 28, 2005) <br />17. Stormwater Management Fee. The current Stormwater Management Fee is $384.00 per <br />unit. Stormwater management fee obligations for the development are Seventy Two <br />Thousand Nine Hundred Sixty Dollars and no cents ($72,960.00) (190 x $384.00), which <br />fees will be paid by T&C at the time of release of final mylar plats. <br />18. Hard Surfaced Driveways. Hard surfaced driveways (bituminous or concrete) are a <br />requirement for each lot in the Plat. Driveways shall be installed by the building permit <br />applicant or the homeowner at the time the Certificate of Occupancy is issued or as soon <br />thereafter as possible, weather permitting. In the event the driveway is not timely installed <br />on a lot, T&C and/or T&C's assign(s), agree that the CITY may install the driveway on <br />the lot and specially assess the cost therefore against the lot. T&C waives all right to a <br />public hearing and other statutory rights or CITY Charter rights granted a property owner <br />relating to special assessments, including the right to appeal the special assessment for <br />installation of the hard surfaced driveway. In addition, T&C grants the CITY a license to <br />enter on each lot of the Plat in order to install the improvement described in this <br />paragraph if the same has not been previously constructed. <br />19. Street Cleaning. After the street surfacing is installed, the DEVELOPERS shall clear any <br />soil, earth, or debris from the streets within the Plat resulting from any construction within <br />the Plat by the DEVELOPERS or its successors and assigns. From time to time, the <br />CITY may remove accumulations of soil, earth and debris from the streets resulting from <br />the construction of the Plat. It shall be the DEVELOPERS' responsibility to pay the <br />costs associated with this necessary street cleaning. Invoices from the CITY to the <br />Ramsey Torun Center 7th Addition <br />Development Contract <br />Page 8 of 20 Pages <br />1311178010 82071& 81181US <br />
The URL can be used to link to this page
Your browser does not support the video tag.