Laserfiche WebLink
Observations: <br />The proposed improvements should have a serviceable life of 60 years, assuming that proactive, regular pavement <br />maintenance treatments are performed during the life of the improvements. <br />Developed properties along the project corridor may have private irrigation systems. Impacts to these systems may <br />occur when existing bituminous curb and gutter is replaced with concrete curb and gutter. Staff will notify property <br />owners in writing of the pending construction as far in advance of construction as possible to allow them time to <br />move their irrigation system components out of the construction area, after which they may replace the components <br />in their original locations. <br />Public Comment <br />On November 1, 2017, Staff conducted a Public Information Meeting from 5:30 - 7:00 pm at City Hall. Notices for <br />this meeting were mailed to all benefiting property owners. Seven (7) property owners attended the meeting. The <br />meeting was conducted as an open house forum, with Staff responding to questions one-on-one from 5:30 — 6:00 <br />pm, and again from 6:35 — 7:00 pm. A formal presentation was provided by Staff from 6:00 — 6:35 pm, which <br />addressed all aspects of the project including project purpose, scope, and schedule, existing conditions, proposed <br />improvements, estimated project costs, proposed funding sources, including special assessments, and a primer on <br />the Public Hearing. <br />In general, the main comment received was that special assessments are difficult for property owners to absorb, that <br />assessments make it difficult to sell your property, and that these projects should be funded through the general <br />fund. <br />Residents also questioned why concrete curb and gutter is being proposed. Staff noted that while bituminous curb <br />does exist on numerous streets throughout the City, the observed life expectancy is less than half that of concrete <br />curb and gutter, and that concrete curb and gutter better directs snow plow drivers preventing damage to sod, <br />mailboxes, landscaping, and irrigation system components. Concrete curb and gutter also better directs drainage <br />along the edges of streets and driveways, and does not degrade as bituminous gutters do. <br />When Staff discussed that irrigations systems are not repaired by the City as part of these projects and that property <br />owners are responsible for repairing their own systems, one resident asked if the City would consider reimbursing <br />residents rather than repairing their systems. Staff responded that this is not currently an option. <br />Any comments received after this case was prepared will be presented to Council before the Public Hearing is <br />opened. <br />Alternatives: <br />Alternative #1 — Motion to adopt Resolution #17-11-285 approving Feasibility Report and ordering Plans and <br />Specifications for Improvement Project #18-00, Stanhope Terrace Street Reconstructions. <br />Alternative #2 — Motion to deny adoption of Resolution #17-11-285 at this time. <br />Funding Source: <br />The Feasibility Report was completed in-house as part of Staff's regular duties. <br />The current Capital Improvement Plan (CIP) estimates costs for reconstructing these streets at $850,000. <br />Per the attached Feasibility Report, the engineer's opinion of probable project costs is $430,934.81. A total of 16 <br />residential parcels will benefit from the proposed improvements and are preliminarily proposed to be assessed for <br />25-percent of eligible project costs which totals $107,733.70. This equates to preliminary assessments of $6,733.36 <br />per parcel. The City will fund the remaining 75-percent of project costs, which totals $323,201.11. The City's costs <br />will be funded using Street Reconstruction and Overlay Program bond funds, as well as a small amount of <br />Stormwater Utility Funds. <br />Assessments are proposed to be assessed over a term of ten years, with interest rates proposed at two percent above <br />