My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/14/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 11/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:39:23 PM
Creation date
11/27/2017 9:25:25 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/14/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
686
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lour 1111.1siion: To work together to reiposibty grow our community, and to provide quality, coat -effective, and efficient government ierrlcas. <br />CC Regular Session <br />Meeting Date: 11/14/2017 <br />Submitted For: Grant Riemer, Engineering/Public Works <br />By: Grant Riemer, Engineering/Public Works <br />Information <br />4. 6. <br />Title: <br />Adopt Resolution # 17-10-263 Accepting Quotes and Awarding Contract for the Installation of Emergency <br />Generator for Well #3, Improvement Project # 17-06 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt resolution # 17-10-263 accepting quotes and awarding a contract for the <br />installation of an emergency generator for well # 3, Improvement Project # 17-06. This project is listed in the <br />2017-2026 CIP under Water Improvements. <br />Background: <br />Currently we have one emergency generator connected to well # 5 which produces a maximum of 850 gallons per <br />minute. Our current consumption rate is 1120 GPM. In a extended power outage we would not be able to keep up <br />with our daily demand for water. The second emergency generator would be connected to Well # 3 which produces <br />1650 GPM and would give us the ability to meet our current daily demand under emergency conditions. <br />At the March 21 st , 2017 PW Committee meeting the committee accepted staff recommendation to enter into a <br />contract with Bolton & Menk Inc. to provide design and construction management for the purchase and installation <br />of an emergency backup natural gas generator for Well # 3, with a not to exceed amount of $11,310.00. Bolten & <br />Menk Inc. has prepared plans and specifications and received quotes from three qualified contractors. The quotes <br />received were as follows: <br />Contractor I°Total Quote <br />IKillmer Electric II$90,500.00 <br />Meier Electric 'IDid not Submit <br />Levin Electric 'Did not Submit <br />Because of Killmers original quote of $195,000.000 staff chose to go with a diesel generator, instead of the natural <br />gas option originally proposed to the PW committee. Staff also explored options of buying the generator outright <br />though one of our cooperative purchasing memberships.The city will now purchase the diesel generator directly <br />through our membership with the National Joint Powers Alliance. By switching to a diesel generator and having the <br />city purchase the generator set, the cost of the generator is now $53,684.61, instead of the originally quoted price of <br />$101,000.00 through the contractor for a natural gas generator. The total cost of the project is now $144,184.61 <br />Notification: <br />
The URL can be used to link to this page
Your browser does not support the video tag.