Laserfiche WebLink
5. FINANCING <br />5.1 Opinion of Cost <br />A detailed opinion of probable costs for the proposed improvements can be found in Appendix B <br />of this report. The opinion of probable costs incorporates anticipated 2018 construction costs for <br />the proposed improvements with 5-percent contingency costs, plus 23-percent indirect costs for <br />administrative, engineering, financing and legal costs. <br />City staff prepared the Feasibility Report in-house as part of staff's normal duties. <br />Braun Intertec prepared the Geotechnical Exploration and Engineering Review, included in <br />Appendix C, at a cost of $3,228.67. <br />5.2 Funding <br />5.2.1 Assessments <br />A portion of the project costs is proposed to be recovered through special assessments <br />levied against the 15 identified benefiting properties; 5 along 163rd Lane, 6 along Alpaca <br />Street, 3 along Chameleon Street, and 1 along 164th Lane. Assessments are proposed to <br />be collected for eligible improvements benefiting residential properties with direct access <br />to the improved segments of the North Forty as described below. A preliminary <br />assessment summary is included below in Table 1. <br />Residential Assessments: <br />Special assessments are proposed to be levied against residential properties having direct <br />access to improved streets. To be consistent with previous applications of the Special <br />Assessments Policy, each residential property is proposed to be assessed using the "per <br />lot" method. <br />Each residential property is preliminarily proposed to be assessed at the rate of $8,644.75 <br />per lot. Since State Statute and the City Charter does not allow for assessments to exceed <br />the benefit to the property, staff therefore requests Council authorization to order a <br />benefit appraisal consultation for this project in accordance with the City's Special <br />Assessment Policy. <br />The Preliminary Assessment Map and Roll are included in Appendix B. <br />Feasibility Report <br />The North Forty Reconstructions <br />City of Ramsey Project No. 18-01 <br />Page 11 <br />