Laserfiche WebLink
EXHIBIT C <br />Engineers Estimate <br />PEARSON PROPERTY WE MOVE DIRT. <br />RAMSEY, MN <br />SITE GRADING AND EROSION CONTROL <br />ITEM # DESCRIPTION <br />1 COMMON <br />2 RESPREAD <br />UNIT QUANTITY UNIT PRICE TOTAL <br />CY 11,000.0 $ 2.00 $ 22,000.00 <br />CY 1,500.0 $ 2.00 $ 34)00.00 <br />3 ROCK CONSTRUCTION ENT EA 1.0 $ 800.00 $ 800.00 <br />4 SILT FENCE AND CONST FENCE LF 7,500.0 $ 1.50 $ 11,250.00 <br />5 NORTH AMERICAN GREEN SC250 TRM SF 420.0 $ 2.75 $ 1,155.00 <br />6 SEEDING (MNDOT 25-131, TYPE 1 MULCH, 22-5-10 TYPE 3 FERT.) ACRE 9.0 $ 600.00 $ 5,400.00 <br />7 MN DOT SEED MIX 33-262 W/CAT7 BLANKET SY 5,240.0 $ 1.75 $ 9,170.00 <br />8 MN DOT 3885 CAT3 EROSION CONTROL BLANKET SY 1,412.0 $ 1.50 $ 2,118.00 <br />9 MN DOT SEED MIX 24-262 W/CAT7 BLANKET SY 2,345.0 $ 2.00 $ 4,690.00 <br />10 CL III RIP RAP CY 4.4 $ 65.00 $ 286.00 <br />11 15" HDPE STORM SEWER LF 275.0 $ 25.00 $ 6,875.00 <br />SUBTOTAL GRADING $ 66,744.00 <br />ESd based on current plans_ May need to be adjusted IS plans change <br />No sewer bypass included <br />No trail, curb, or sidewalk grading <br />Street Sw eeping charged at $125/hr <br />No import/export unless noted <br />No frost or winter conditions <br />Respread with onsite materials only <br />aid contingent on agreeable contract language <br />No dewatenng ortemporary drainage unless noted <br />No Bond or permits included <br />Import/Export will be paid by truck volume as verified by truck slips <br />No mulch or -plantings, no pond liner, no responsibility for infiltration levels unless noted <br />Price does not include soil conditioning <br />No relocation of utilities <br />Bid based on current plan set, any plan changes could result in additional charges. <br />CAD is assumed to be representative of the site and is subject to verification, any significant differences in grades may result In additional charges. <br />No Haz Mat or Asbestos, no burrried trash or debris, no contaminated soil unless noted <br />No Fence removal or Demo Unless Noted <br />Sub grade correction will be charged for any correction below subgrade <br />No SW PPP permits or inspection unless noted. <br />No testing or retesting No engineering or surveying. <br />No broad hold harmless, responsible for our work only <br />No repairs duet trench settling <br />No trench borrow unless noted <br />Bid is for one MOB, additional MOBS will be extra <br />No regrading after Utility, Street Crews arrive unless previously arranged. <br />No pilings or shoring <br />Terry Bros., Inc. reserves the right to remove equipment from the site regardless of contract default or termination. <br />No dust control or Street Sw eepingunless noted <br />Progess payments are due within 30 days of invoice, any delay in paym ent is subject to a service charge of 1,5%/month <br />No correction below 1' and no muck Excavation <br />Noretaining wall excavation or gradingunl ess noted <br />No Traffic Control <br />