My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Council - 02/26/2002
Ramsey
>
Public
>
Minutes
>
Council
>
2002
>
Minutes - Council - 02/26/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 11:18:22 AM
Creation date
5/6/2003 10:50:57 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Council
Document Date
02/26/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9) Adopt Resolution #02-02-052 Authorizing Execution of MnDOT Agreement 81470 for <br /> Community Roadside Landscaping Partnership Program <br /> 10) Adopt Resolution #02-02-053 in Support of the Northstar Commuter Rail Project <br /> <br />Motion carried. Voting Yes: Mayor Gamec, Councilmembers Kurak, Anderson, Hendriksen, <br />and Zimmerman. Voting No: None. <br /> <br />COUNCIL BUSINESS <br /> <br />Case #1: <br /> <br />Request for Final Plat Approval of Highlands at River Park; Case of Centex <br />Homes <br /> <br />Community Development Director Frolik stated that last September, Centex Homes received <br />preliminary plat approval for the subdivision of property generally located north of Alpine Drive <br />NW (153rd Avenue NW) and east of T.H. #47. The property is approximately 74 acres in size <br />and the approved preliminary plat consists of 157 single-family lots. Centex has submitted a <br />request for final plat approval of the first phase, which consists of 58 lots. They are proposing to <br />name the subdivision Highlands at River Park. This first phase of the Centex development <br />consists of 58 lots in the southwest comer of the property. In accordance with the approved <br />preliminary plat, a number of outlots are being platted on the north boundary of the plat to <br />facilitate future sale of these outlots to adjacent property owners in Reilley Estates and Reilley <br />Estates 3rd Addition. All of the lot dimensions and areas conform substantially to the approved <br />preliminary plat. The lots will be served by the construction of Yakima Street north off of <br />Alpine Drive NW, 155~' Lane NW, and South Yakima Court NW. All of the drainage and utility <br />easements are being provided in accordance with City Code and the approved grading plan as it <br />affects this area of the plat. The final Grading Plan needs to be modified to state that elevation <br />certificates prepared by a registered land surveyor are required at the footing inspection, that a <br />certificate of grading will be required prior to issuance of certificate of occupancy for lots that <br />have grades less than 2%, and that there will be the addition of one tree to each lot. As a result of <br />several meetings with the Park Commission, a very in-depth park dedication agreement has been <br />drafted that addresses the entire 74 acres as reflected in the approved preliminary plat. A portion <br />of the park dedication will consist of land dedications to expand Woodland Green and Bear Parks <br />and provide trail connections to the unnamed park to the north and Bear Park. The remaining <br />park dedication due will consist of park improvements to Woodland Green and Bear Parks equal <br />to a cash value of $124,500.00. The parking improvements include grading and turfing the <br />expansion to Woodland Green Park, installing a play structure and parking lot in Woodland <br />Green Park, providing 6-inch water service to Woodland Green and Bear Parks, and sewer <br />service to Woodland Green Park. Remaining park dedication funds will be considered for <br />additional miscellaneous improvements at Woodland Green and Bear Parks. The development <br />agreement for this first phase also addresses the trail plan for the entire 74 acres. Sidewalks will <br />be constructed on one side of all non cul-de-sac streets. Trail connections are proposed to and <br />through Bear Park to the east all the way to Roanoke Street, through the unnamed park lot to the <br />north to 156'h Lane, and along the north side of Alpine Drive from Highway #47 to Roanoke <br />Street. The exact alignment of the trail from the east terminus of 155th Lane, through Bear Park <br /> <br />City Council/February 26, 2002 <br /> Page 6 of 35 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.