My WebLink
|
Help
|
About
|
Sign Out
Home
Comp Plan 1974-1977 FILE #1
>
Comprehensive Plan
>
Comprehensive Plan (old)
>
1970-1979
>
Comp Plan 1974-1977 FILE #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:33:25 AM
Creation date
12/7/2004 2:45:36 PM
Metadata
Fields
Template:
Engineering
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
d. Rapi_dly ~Permeabl e Soils. <br /> <br /> 1. Filter material for a soil treatment unit using gravity distribution <br />of effluent shall not be placed in contact with original soil having a percolation <br />rate faster than one-half minute per inch. <br /> <br /> 2. For coarse soils having a percolation rate faster than one-half minute <br />minute per inch, at least six inches of sandy loam textured soil having a percolation <br />rate betwen five and fifteen minutes per inch after placement (loamy sand to sandy <br />loam) shall be placed between the filter material and the coarse soil along the <br />excavation bottom and sidewalls. <br /> <br /> 3. For soils with percolation rates between one-half and five minutes per <br />inch, at least one of the following treatment techniques shall be used. <br /> <br /> (a) Provide at least six inches of sandy loam textured soil with a percolation <br />rate between five and fifteen minutes per inch after placement between the filter <br />material and the coarse soil. <br /> <br /> (b) Divide the total soil treatment area into at least four equal parts <br />connected serially. <br /> <br />e. Mounds. <br /> <br /> 1. Mounds may be constructed on soils having the site or soil conditons <br />specified in Section 4.07. <br /> <br /> 2. The soil percolation rate in all layers of the natural or fill soil <br />to a depth of at least 24 inches below the sand shall be faster than 120 minutes <br />per inch. <br /> <br /> 3. Below the sand layer there shall be at least one layer of soil, either <br />natural or fill, at least 12 inches thick, which has a percolation rate slower than <br />five minutes per inch (loamy sand). <br /> <br /> 4. Wherever possible, mounds shall be located on flat areas or crests of <br />slopes. Mounds shall not be located on natural slopes of more than three percent <br />if the percolation rate is slower than 60 minutes per inch to a depth of at least <br />24 inches below the sand layer. <br /> <br /> 5. Mounds shall not be located on slopes exceeding six percent if the soil <br />percolation rate is slower than 30 ,~inutes per inch to a depth of at least 24 inches <br />below the sand layer. <br /> <br />18 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.