Laserfiche WebLink
(11o PLAN ELEMENT, Continued) <br /> <br />500 <br /> <br />FACILITIES PLAN <br /> <br />510 ,Transportation <br /> <br />520 <br /> <br />530 <br /> <br />511 <br /> <br />Test alternative systems in terms of t:unctlon, fulfill- <br />menf of needs, energy ef~ciency, community ob- <br />jectives, and critical area determinations. <br /> <br />512 <br /> <br />Coordinate preliminary recommendations with the plans <br />of the Metropolitan Council, Transportation Advisory <br />Board, County and the State, <br /> <br />513 <br /> <br />Prepare a THOROUGHFARE PLAN in coordination with <br />other elements of the Plan. <br /> <br />Waste Management <br /> <br />521 <br /> <br />Evaluate and modify waste management policies as <br />related to other plan elements. <br /> <br />521.1 <br />521.2 <br /> <br />Sewered areas <br />On-site disposal areas <br /> <br />522 <br /> <br />Test the sanitary sewer plan against the other plan <br />elements, <br /> <br />522.1 <br /> <br />Capacity versus flow anticipated From population <br />and Land Use forecasts. <br /> <br />522.2 <br /> <br />Urban Service Area vs. Rural Service Area <br /> <br />523 <br /> <br />Correlate sewer timing and staging with development <br />staging in other Plan Elements. <br /> <br />524 <br /> <br />Correlate storm water collection system and staging with <br />development staging. <br /> <br />Community Facilities <br /> <br />531 <br /> <br />Prepare and review Preliminary Plan in terms ot: t:unction, <br />economics and Critical Area determinations. <br /> <br />General Scope of Activities <br /> a = Minor <br /> b = Average <br /> c = Major <br /> <br />532 <br /> <br />Prepare a COMMUNITY FACILITIES PLAN in coordination <br />with other elements of the Plan, <br /> <br />-15- <br /> <br /> <br />