My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/12/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 12/12/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:40:04 PM
Creation date
12/13/2017 8:45:32 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/12/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1007
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRELMHNARYESTIMATE - NORTHFORKITASCA SHORES <br />Item Description UnitEstimated <br />No. Quantity <br />1 1 $600.00 <br />2 41 $3.00 <br />3 50 $1.25 <br />4 300 $2.50 <br />5 472 $63.00 <br />6 2 $375.00 <br />7 78 $6.50 <br />8 16 $40.00 <br />9 LS 1 $1,000.00 <br />Item <br />No. <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />Item <br />No. <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />Mobilization <br />Sawing Bituminous Pavement - Full Depth <br />Mill Bituminous Pavement (2" Depth - Street Tie-in) <br />Bituminous Material for Tack Coat <br />Type SP 9.5 Wearing Course Mixture (SPWEA340C) (2.0") <br />Adjust Casting (Storm Sewer) <br />6" Concrete Walk <br />Truncated Domes <br />Traffic Control <br />LS <br />LF <br />SY <br />GAL <br />TON <br />EA <br />SF <br />SF <br />Northfork Itasca Shores Construction Cost <br />5% Contingency Cost <br />14% Indirect Cost <br />Northfork Itasca Shores Preliminary Project Cost <br />PRELMHNARYESTIMATE - NORTHFORK <br />Description <br />Mobilization <br />Sawing Bituminous Pavement - Full Depth <br />Mill Bituminous Pavement (2" Depth - Street Tie-in) <br />Bituminous Material for Tack Coat <br />Type SP 9.5 Wearing Course Mixture (SPWEA340C) (2.0") <br />Traffic Control <br />Unit <br />Estimated <br />Quantity <br />LS 1 <br />LF 57 <br />SY 145 <br />GAL 389 <br />TON 612 <br />LS 1 <br />Unit Cost Cost Extension <br />$600.00 <br />$123.00 <br />$62.50 <br />$750.00 <br />$29,736.00 <br />$750.00 <br />$507.00 <br />$640.00 <br />$1,000.00 <br />$34,168.50 <br />$1,708.43 <br />$5,022.77 <br />$40,899.69 <br />Unit Cost Cost Extension <br />$800.00 <br />$3.00 <br />$1.25 <br />$2.50 <br />$63.00 <br />$1,000.00 <br />Northfork Construction Cost <br />5% Contingency Cost <br />14% Indirect Cost <br />Northfork Preliminary Project Cost <br />PRELMHNARYESTIMATE - NORTHFORK 2" D & 3RD <br />Description <br />Mobilization <br />Sawing Bituminous Pavement - Full Depth <br />Mill Bituminous Pavement (2" Depth - Street Tie-in) <br />Bituminous Material for Tack Coat <br />Type SP 9.5 Wearing Course Mixture (SPWEA340C) (2.0") <br />Adjust Casting (Storm Sewer) <br />Traffic Control <br />LS <br />LF <br />SY <br />GAL <br />TON <br />EA <br />$800.00 <br />$171.00 <br />$181.25 <br />$972.50 <br />$38,556.00 <br />$1,000.00 <br />$41,680.75 <br />$2,084.04 <br />$6,127.07 <br />$49,891.86 <br />Unit Estimated Unit Cost Cost Extension <br />Quantity <br />1 <br />90 <br />145 <br />755 <br />1,186 <br />6 <br />$2,000.00 <br />$3.00 <br />$1.25 <br />$2.50 <br />$63.00 <br />$375.00 <br />LS 1 $1,000.00 <br />Northfork 2nd & 3rd Construction Cost <br />5% Contingency Cost <br />14% Indirect Cost <br />Northfork 2nd & 3'd Preliminary Project Cost <br />$2,000.00 <br />$270.00 <br />$181.25 <br />$1,887.50 <br />$74,718.00 <br />$2,250.00 <br />$1,000.00 <br />$82,306.75 <br />$4,115.34 <br />$12,099.09 <br />$98,521.18 <br />Feasibility Report <br />2018 Street Overlay Improvements <br />City of Ramsey Project No. 18-03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.