My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/12/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 12/12/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:40:04 PM
Creation date
12/13/2017 8:45:32 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/12/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1007
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Public Works Committee held its regular meeting on November 21, 2017 and discussed the following cases: <br />1. Consider Recommending City Council Approval of Pedestrian Trail Easement Vacation on Lot 6, Block 3, <br />Wildlife Sanctuary Third Addition: City Engineer Westby reviewed the staff report, and Parks and Assistant Public <br />Works Superintendent Riverblood presented an alternative future trail connection route which would allow the <br />pedestrian trail easement on Lot 6, Block 3, Wildlife Sanctuary Third Addition to be vacated. Motion to ratify the <br />recommendation of the Public Works Committee to recommend that the City Council not vacate the pedestrian trail <br />easement on Lot 6, Block 3, Wildlife Sanctuary Third Addition, but direct staff to talk with the resident about <br />removing the blacktop with the resident responsible for restoration. <br />2. Consider Request for Additional Stop Signs at the Intersection of 163rd Avenue / Marble Street: Public Works <br />Superintendent Riemer reviewed the staff report and explained staff has received a petition signed by 17 residents <br />requesting additional stop signs at the intersection of 163 rd Avenue and Marble Street. Currently, there are stop <br />signs on the Marble Street portions of the intersection. He explained the reasons given for the additional stop signs <br />are excessive speed and poor visibility at the intersection when traveling westbound on 163-d Avenue. Staff <br />reviewed the traffic counts for the area, noting the traffic counts and accident history do not meet warrants to <br />change this to a 4-way stop condition. With regard to the issue of poor visibility, staff would recommend cutting <br />back vegetation in the northwest corner of the intersection. Staff recommends not installing additional stop signs at <br />this intersection based on the low traffic counts and accident history not relating to the intersection. Motion to ratify <br />the recommendation of the Public Works Committee to recommend that the City Council not install additional stop <br />signs at this intersection based on the traffic counts and accident history, that speed limit signs be posted in both <br />directions, and the Police Department continue to enforce the 30-mph speed limit in the area in an effort to reduce <br />speeds on 163rd Avenue. <br />3. Consider Public Infrastructure Feasibility Study for The COR: Assistant to the City Administrator Brama <br />reviewed the staff report and Bolton & Menk work order to provide concept level plans and a feasibility report for <br />all remaining needed public infrastructure in The COR. This work order is consistent with the City of Ramsey EDA <br />Work Plan, Tactic/Strategy #2, and approved by the EDA/City Council for the Inland Group/Affinity apartment <br />project. Staff explained that Bolton & Menk has provide the City of Ramsey with similar services in the past for the <br />new Ramsey Business Park and was selected at that time, through a competitive RFP process based on quality of <br />services and competitive pricing. Staff is comfortable recommending Bolton & Menk for this work order based on <br />their track record of helping staff successfully with similar projects, they are familiar with and have completed <br />several recent projects in The COR, and are a Ramsey business. Motion to ratify the recommendation of the Public <br />Works Committee to recommend that the City Council authorize the Bolton & Menk work order, not to exceed <br />$25,384, to complete concept designs and feasibility reports for all remaining public infrastructure needed in The <br />COR. <br />4. Consider Recommending City Council Approval of September 2017 Comprehensive Sanitary Sewer Study <br />Update: City Engineer Westby reviewed the staff report and explained the purpose of this case is to consider <br />recommending City Council approval of the September 2017 Comprehensive Sanitary Sewer Study Update. It was <br />noted the 2012 Comprehensive Sanitary Sewer Study was prepared with the goal of meeting the City's <br />infrastructure needs based on development projected within the City's 2030 Comprehensive plan. The 2017 <br />Comprehensive Sanitary Sewer Study Update incorporates current population and land use projection, addresses <br />impact on the City's sanitary sewer infrastructure due to development that has occurred in the last five years as well <br />as currently proposed and projected development out to the year 2040 to be consistent with the 2040 <br />Comprehensive Plan updates that are underway. The Public Works Committee recommended City Council <br />approval of the September 2017 Comprehensive Sanitary Sewer Study Update, including the sanitary sewer <br />infrastructure needed to serve the 167th node area. Council approved the September 2017 Comprehensive Sanitary <br />Sewer Study Update on November 28th. <br />5. Consider Recommending City Council Approval of September 2017 Comprehensive Water System Study <br />Update: City Engineer Westby referenced the staff report and explained the purpose of this case is to consider <br />recommending City Council approval of the September 2017 Comprehensive Water Study Update. He noted it is <br />the same consideration as the previous case with updating projections. The 2012 Comprehensive Water System <br />Study was prepared with the goal of meeting the City's infrastructure needs based on development projected within <br />the City's 2030 Comprehensive Plan. The 2017 Comprehensive Water System Study Update incorporates current <br />population and land use projects and addresses impacts on the City's water system infrastructure due to <br />development that has occurred since 2012 as well as currently proposed and projected development out to the year <br />2040 to be consistent with the 2040 Comprehensive Plan Updates that are underway. The Public Works Committee <br />recommended City Council approval of the September 2017 Comprehensive Water System Study Update, and <br />
The URL can be used to link to this page
Your browser does not support the video tag.