My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/12/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 12/12/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:40:04 PM
Creation date
12/13/2017 8:45:32 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/12/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1007
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
improvements. The purpose is to ensure adequate pressure and flow is maintained <br />throughout the entire distribution system at any given time and at the most economical <br />cost. <br />The timing of implementation of new water distribution mains will be determined based <br />on development within the City. Figure 1, located in Appendix C, shows the location of <br />the proposed distribution system improvements. <br />Table 5.1 provides a summary of the proposed water distribution system improvements . <br />These improvements generally can be categorized as follows: <br />Table 5.1 <br />Distribution System Improvements <br />2012-2031 <br />City of Ramsey, Minnesota <br />Project Estimated Capital Cost <br />Southwest Loop $2,160,000 <br />North Central Loop $2,900,000 <br />County Road 57 $380,000 <br />CSAH 5/153rd Street $650,000 <br />156th Lane NW $325,000 <br />In addition to these improvements, on -going maintenance and replacement projects are <br />required throughout the system. <br />City of Ramsey, Minnesota — R13.104504 Page 28 <br />Comprehensive Water System Study Prepared by Bolton & Menk, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.