Laserfiche WebLink
improvements. The purpose is to ensure adequate pressure and flow is maintained <br />throughout the entire distribution system at any given time and at the most economical <br />cost. <br />The timing of implementation of new water distribution mains will be determined based <br />on development within the City. Figure 1, located in Appendix C, shows the location of <br />the proposed distribution system improvements. <br />Table 5.1 provides a summary of the proposed water distribution system improvements . <br />These improvements generally can be categorized as follows: <br />Table 5.1 <br />Distribution System Improvements <br />2012-2031 <br />City of Ramsey, Minnesota <br />Project Estimated Capital Cost <br />Southwest Loop $2,160,000 <br />North Central Loop $2,900,000 <br />County Road 57 $380,000 <br />CSAH 5/153rd Street $650,000 <br />156th Lane NW $325,000 <br />In addition to these improvements, on -going maintenance and replacement projects are <br />required throughout the system. <br />City of Ramsey, Minnesota — R13.104504 Page 28 <br />Comprehensive Water System Study Prepared by Bolton & Menk, Inc. <br />