Laserfiche WebLink
estimates were assumptions of potential construction costs based on similar park development in the region, and <br />'rough numbers'. For Municipal Plaza this equated to $40 per square foot, and for the larger 'Lake Ramsey <br />Commons' $11 per square foot. <br />The schematic design project for these two parks, coupled with the later to be authorized civil engineering work, <br />will result in plans (not construction documents) for these parks that have reliable cost specificity, allowing the Park <br />and Recreation Commission and City Council to better consider future capital improvements. The detailed plans <br />will also allow many of the park program components to be done in increments or phases (E.g. mass grading, then <br />landscape, then splash pad etc.). <br />Observations/Alternatives: <br />N/A <br />Funding Source: <br />The Scope of work for the schematic design for the two parks is a not -to -exceed amount of $30,000, plus <br />contingency of $5,000. $40,000 was reserved from the 2016 Parks General Fund budget, anticipating this <br />work to begin in 2017. <br />The balance of the funding for next phase of this project (civil engineering) is recommended to come from the Park <br />Trust Fund. It may be noted here, that the estimated Park Dedication proceeds from the Inland/Affinity Living <br />project is $386,750 <br />Recommendation: <br />Bruce Jacobson and LHB have a demonstrated effectiveness in working with City Staff and the Park and <br />Recreation Commission in developing the COR Parks + Public Places — Public Realm Framework document. This <br />plan has informed in a favorable way, many aspects of the The COR Interim Development Plan. <br />Additionally, Mr. Jacobson is intimately familiar with The COR, having worked with the City's staff, Park and <br />Recreation Commission and City Council over the years —first with the Town Center park plan, and later the <br />successful implementation of The Draw. Accordingly, staff is very comfortable recommending the consulting team <br />of Bruce Jacobson and LHB for the work this case discusses. <br />Staff would note, the Alternative: If the City Council prefers to complete a formal RFP process, staff will bring back <br />a RFP document for approval in January (proposals would be received in February). A contract would be approved <br />in March. This would add about 45-60 days to the process. <br />Action: <br />Motion to: <br />Authorize the attached Schematic Design Proposal (consulting team of Bruce Jacobson and LHB), at a not to <br />exceed cost of $30,000, with a $5,000 contingency to complete concept designs and feasibility reports for the two <br />park spaces in The COR. <br />The COR Interim Dev Plan <br />COR Parks and Public Realm Plan <br />The COR 'systems' plan <br />Schematic design proposal <br />Civil engineering estimate <br />Attachments <br />