My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/12/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 12/12/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:40:04 PM
Creation date
12/13/2017 8:45:32 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/12/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1007
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Mark Riverblood <br />December 6, 2017 <br />Page 2 of 3 <br />Plans and Design Documents - General <br />We will work with the City and Landscape Architect to translate studies, plans, sections and other <br />preliminary design drawings described in the project proposal into construction document format <br />including the following: <br />• Preliminary and Final Layout / Dimension Plan, <br />• Preliminary and Final Grading / Drainage Plan (with stormwater management <br />components), <br />• Preliminary and Final Utility / Infrastructure Plan (as needed), and <br />• Design Details (as needed). <br />Schematic Design <br />We will work with the City and the Landscape Architect, beginning at the schematic design phase of the <br />process. Our work scope is anticipated to include the following: <br />• Prepare a topographic background drawing using current/existing topographic data files. We' 11 <br />use aerial photography and topographical survey data to complete the base map. <br />• Convert the conceptual site plan layout, per direction from Owner and Landscape Architect, into <br />AutoCAD Civil 3D format. <br />• Prepare preliminary design drawings for site improvements, including stormwater management <br />concepts. <br />• Incorporate anticipated surface improvements, including erosion control and other project <br />elements, into the preliminary drawings. <br />• Review potential site constraints, submittal process requirements, and other project requirements <br />with the City and Landscape Architect. <br />• Attend meetings with Owner, Landscape Architect and applicable agencies as needed. <br />The fees for this task are estimated to be between $12,000 and $18,000. <br />Design Documentation <br />We'll prepare design documents in a format suitable for receiving bids from contractors. Tasks associated <br />with this items are anticipated to be as follows: <br />• Coordinate further design refinements with Owner and Landscape Architect for site layout and <br />stormwater management components. <br />• Prepare civil construction drawings to include site demolition plan, site grading plan, surface <br />drainage/stormwater management plan, erosion control and site details, pavement sections (as <br />needed), site utilities plan, and other design elements. <br />• Submit civil engineering plans and preliminary cost estimate for Owner and Landscape Architect <br />review. <br />• Prepare and submit final civil engineering plans to Owner and Landscape Architect for final <br />review and confirmation of probable construction costs. <br />We estimate fees associated with this task to be in the range of $15,000 to $18,000. <br />H:\RAMS\R16114924\Ramsey Center Street Proposal\COR Parks Area Analysis 12 062017.docx <br />Bolton & Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.