Laserfiche WebLink
MEMORANDUM <br />• • <br />i • <br />LANDFORM <br />From Site to Finish <br />• • <br />105 South Fifth Avenue Tel: 612-252-9070 <br />Suite 513 Fax: 612-252-9077 <br />Minneapolis, MN 55401 www.landform.net <br />DATE June 8, 2017 <br />TO Bruce Westby, City Engineer <br />cc Tim Gledhill, Community Development Director, Bryon Cole, <br />FROM Reid Schulz <br />RE Cole Addition <br />Mr. Westby, <br />As part of the "Cole Addition" subdivision, we are requesting to vacate the drainage and utility <br />easement on our subject property. It is our understanding that this easement is for the sole purpose <br />to convey drainage to the neighboring property where a wetland/storage basin exists. As part of our <br />proposed stormwater management plan, we are proposing to direct more water to the west through <br />the public right of way, where City storm sewer infrastructure exists and reduce the rate and volume <br />of water directed to the east on the adjacent property. <br />To ensure the high-water elevations of the wetland are not increased with our development, we <br />modelled the existing conditions and the proposed conditions for the subwatershed area to this <br />wetland. Enclosed please find the drainage maps and report. In summary, the HWL of the wetland in <br />the proposed condition are less than the existing condition for the 2-yr, 10-yr and 100-yr events as <br />modelled in hydrocad. <br />We appreciate the City reviewing this information and supporting the vacation of the existing <br />easement. Please feel free to contact me with any questions or concerns. <br />Sincerely, <br />S-- <br />Reid Schulz <br />Project Lead <br />Landform°, Sensibly ° and Site to Finish° are registered service marks of Landform Professional Services, LLC. <br />1 <br />