My WebLink
|
Help
|
About
|
Sign Out
Home
Comp Plan 1981-1983 FILE #3
>
Comprehensive Plan
>
Comprehensive Plan (old)
>
1980-1989
>
Comp Plan 1981-1983 FILE #3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:33:25 AM
Creation date
12/9/2004 1:41:34 PM
Metadata
Fields
Template:
Engineering
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
']' IT1ETRGPOLITAN <br />I WA/~ <br /> COnT 01. <br /> (omml//ion <br /> <br />ATTACHMENT VI <br /> <br />April 23, 1982 <br /> <br />mETROIOUflRE BLDG. <br />711.1 & ROBERT/TREE'r/ <br /> /~lm' PflUL mn 551Ol <br /> 6121222.842~ <br /> <br />Mr. Charles Weaver, Chairman <br />Metropolitan Council <br />300 Metro Square Building <br />St~ Paul, MN 55101 <br /> <br />Re: City of Ramsey Comprehensive Plan <br /> Metropolitan Council Referral File NOo 9040:2 <br /> <br />Dear Mro' Weaver: <br /> <br />The Metropolitan Waste Control. Con~nission. has reviewed'plan revisions. <br />submitted April 15, 1982 for the-Ramsey Comprehensive Plano She City <br />has reduced its wastewa~er flow projections in response to Council <br />coments. The-Con~nission offers the following-co~nents: and recommendations' <br /> <br />The revisions indicate that the City has submitted a resolution <br />requesting the-Metropolitan Council to amend the Water Resources <br />Management Plan to.-include construction of the second Ramsey <br />connection Dy 1984.. As the project is not programmed in the <br />1982-1987 Development Program., the Commission should be advised <br />as to the development fremework for this area and kept informed <br />of the status of this request° <br /> <br />The plan should indicate the minimum design'standards regarding <br />infiltratiOn/inflow into the sanitary sewer system for new <br />construction° <br /> <br />3) <br /> <br />4) <br /> <br />A copy of the. City's on-site sewage disposal system ordinance <br />should be submitted as part of't~e plano In addition, the plan <br />should' clarify tf'licens~'ng of septic tank pumpers is required° <br />The City should estaDlfsh a program to license septic pumpers <br />and require pumpers to report the amount of septage and location <br />of septage disposal sites on an annual basis. Licenses should <br />be issued to. those_who meet training and knowledge requirements <br />as evidenced Dy the satisfactory completionof a certifications <br />program, <br /> <br />The City should report to the Co~ission the following informatio[~ <br />annually: <br /> <br />a) Number of 5'utlding permits where on:site systems are install( <br /> <br />b) Number andlocationof reported, on-site system problems~ <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.