My WebLink
|
Help
|
About
|
Sign Out
Home
Comp Plan 1981-1983 FILE #3
>
Comprehensive Plan
>
Comprehensive Plan (old)
>
1980-1989
>
Comp Plan 1981-1983 FILE #3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:33:25 AM
Creation date
12/9/2004 1:41:34 PM
Metadata
Fields
Template:
Engineering
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
15153NOWTHEN BOULEVARD .., AMSEY, SOTA55303 "(612) 427-1410 <br /> <br />February 28, 1983 <br /> <br />Mr. Greg Johnson <br />Metro Council Staff <br />Metropolitan Council <br />300 Metro Square Building <br />St. Paul, MN 55101 <br /> <br />RE: Final Progress Report to Metro Council <br /> Contract No. 78100; Submission of <br /> <br />Dear Mr. Johnson: <br /> <br />I am enclosing our Final Progress Report regarding Metro Contract <br />No. 78100 which pertains to the expanditure of Metro Council grant <br />funds on the Ramsey Comprehensive Plan. <br /> <br />It should be noted that considerably more was accomplished in the <br />Ramsey Comprehensive Plan such as the drainage study and water study° <br />The City of Ramsey felt that these two studies were very important <br />factors and should be accomplished. However, the one problem that <br />the City of Ramsey encountered was that a considerable amount of <br />sewer policy had to be redone by the City Engineer. <br /> <br />Evidently, when Wehrman, Chapman and Associates, Inc. bid to do the <br />Ramsey Comprehensive Plan they did not understand the indepth work <br />that would be required in the sewer policy, consequently they under <br />bid that area of work. The work they did on it was not adequate for <br />the Metro Council. The end result was the City of Ramsey having to <br />back up and redo that area which added to the expense of this plan. <br /> <br />If you have any further questions on the enclosed documents, please <br />feel free to call me. <br /> <br />Sincerely, ~~ .... <br /> <br />Enclosure' <br /> <br />CC: <br /> <br />C-1 (Mayor and Councilmembers) <br />General files <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.