My WebLink
|
Help
|
About
|
Sign Out
Home
Comp Plan 1978-1980 FILE #2
>
Comprehensive Plan
>
Comprehensive Plan (old)
>
1970-1979
>
Comp Plan 1978-1980 FILE #2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:33:25 AM
Creation date
12/9/2004 2:36:27 PM
Metadata
Fields
Template:
Engineering
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(11. PLAN ELEMENT~ Continued) <br />500 FACILITIES PLAN <br /> <br />510 <br /> <br />Transportation · .. <br /> <br />511 TeSt alternative systems in terms of functlon~ fulfill- <br /> ment of needs, energy efficiency~ community ob- <br /> jectives, and critical area determinations. <br /> <br />512 <br /> <br />Coordinate preliminary recommendations with the plans <br />of the /vletropolitan Council, Transportation Advisory <br />Board, County and the State. <br /> <br />513 <br /> <br />Prepare a THOROUGHFARE PLAN in coordination with <br />other elements of the Plan. <br /> <br />520 <br /> <br />Waste Management <br /> <br />521 <br /> <br />Evaluate and modify waste management policies as <br />related to other plan elements. <br /> <br />522 <br /> <br />521.1 Sewered areas <br />521,2 On-site disposal areas <br /> <br /> Test the sanitary sewer plan against the other plan <br /> elements. <br /> <br />522.1 <br /> <br />Capacity ve~us flow anticipated from population <br />and Land Use forecasts. <br /> <br />522.2 <br /> <br />Urban Service Area vs. Rural Service Area <br /> <br />523 <br /> <br />Correlate sewer timing and staging with development <br />staging in other Plan Elements. <br /> <br />524 <br /> <br />Correlate storm water collection system and staging with <br />development staging. <br /> <br />530 <br /> <br />Community Facilities <br /> <br />531 <br /> <br />Prepare and review Preliminary Plan in terms of function, <br />economics and Critical Area determinations. <br /> <br />General Scope of Activities <br /> a = Minor <br /> b = Average <br /> c = Major <br /> <br />532 <br /> <br />Prepare a COMMUNITY FACILITIES PLAN in coordination <br />with other elements of the Plan. <br /> <br />-15- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.