My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/14/2004
Ramsey
>
Public
>
Agendas
>
Council
>
2004
>
Agenda - Council - 12/14/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:36:01 PM
Creation date
12/13/2004 7:46:30 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/14/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
409
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVIEW ALTERNATE STREET LIGHT FIXTURE FOR RAMSEY TOWN <br />CENTER <br /> By: Leonard Linton, Civil Engineer <br /> <br />Background: <br /> <br />Ramsey Town Center LLC previously submitted pictures and information on the <br />proposed street light package (poles, heads and bases) to be installed in the project. <br />These fixtures were to be used along all public streets and in commercial parking lots. <br />The poles will also support the traffic signs along the streets and will complement the <br />streetscape design. The chosen fixture family was not a stock item for Connexus and <br />consequently the maintenance fee would be higher than the standard fixture. This was <br />considered during the discussion of the fixtures and it was agreed that since Ramsey <br />Town Center is to be a signature development the increased price would be justified. <br /> <br />The developer and Connexus commenced negotiations regarding ordering these fixtures. <br />Little progress has been made on getting fixtures ordered. Recently it was revealed that <br />the promoted fixture is not on a non-stock item for Connexus, but is a special order item <br />from the factory. There is a tooling setup charge in addition to the per fixture price and <br />full payment for the order is required before manufacturing will begin. RTC LLC has not <br />been willing to provide the funding to order the fixtures for the entire project at this time. <br /> <br />Sunwood Drive has been paved and is ready to open for traffic. The wiring for the <br />lighting has been installed, installation of the poles and heads is not possible at this time <br />because of the impasse over placing the full order as outlined above. Town Center <br />Gardens, the development north of Bunker Lake Boulevard and west of Ramsey <br />Boulevard has delayed installing street lights, The developer wanted to use the same <br />style fixture as in Ramsey Town Center to provide a visual tie between the two projects. <br /> <br />Observations: <br /> <br />Connexus has suggested an alternative fixture that is a stock item for them and can be <br />ordered in a custom color with out incurring tool set up charges. Information on the <br />proposed fixture is attached along with pricing information on the approved and proposed <br />fixtures. <br /> <br />Recommendation: <br /> <br />Staff recommends approving the alternative fixture. <br /> <br />Action: <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.