Laserfiche WebLink
CORRIO01~ ~A~t <br /> <br />TH'fO interr¢., _g.ional- Corridor Study <br /> <br />ISSUES IDENTIFIED TO DATE <br /> <br />Traffic Operation and Mobility Issues <br /> <br />Concerned about poor traffic operations at some <br />TH 10 interchanges - wondering what Mn/DOT <br />might provide in the way of improvements <br /> <br />Would like to see congestion on TH 1 0 alleviated <br />by the addition of-a 3r° lane in each direction of <br />highway <br /> <br />3. Would like to see a new river crossing connecting <br /> TH 10 and 1-94 <br /> <br />4. Would like to be able to meet travel performance <br /> criteria established for corridor <br /> <br />5. Would like to reduce the need for additional <br /> signals along TH 10 <br /> <br />6. Would like to have infrastructure available to <br /> support tele-comrnuting 0~'a ~n TAC Meeting) <br /> <br />Concerned that traffic congestion on TH 1 0 <br />results in the diversion of through traffic on to the <br />local road system (ID'd in PAC Meeting) <br /> <br />= <br /> <br />VVould like to see entire road system in area <br />examined versus focusing entirely on TH 10 <br />in PAC Meeting) <br /> <br />14 Page 14 of 29 <br /> <br /> <br />