Laserfiche WebLink
Review File: Greenway Terrace <br />Sketch Plan and Site Plan Review: Landscaping <br />June 16, 2017 <br />Page 2 of 2 <br /> <br /> <br />Mountain Frost Pear is an uncommon species and may prove challenging to obtain. An <br /> <br />alternative species should be contemplated. <br />Japanese Barberry is a prohibited shrub species and both proposed varieties must be <br /> <br />replaced with an alternative species. <br />Four (4) inches of topsoil meeting the Citys specification shall be applied to all disturbed <br /> <br />areas, źƓĭƌǒķźƓŭ ĬƚǒƌĻǝğƩķƭ, not otherwise improved with impervious surfaces (building, <br />parking lot, walkways, etc.). <br />Irrigation system must be equipped with both a rain sensor and at least one water <br /> <br />efficient technology such as soil moister sensor(s), smart controller, ET sensor, etc. <br />Scale appears to be 1 = 40 but is labeled as 1 = 20, please correct. <br /> <br />There are a number of instances where text is not legible, please adjust to ensure that <br /> <br />text is not overlapped with other text or lines. <br />The City requires a two (2) year warranty period from the date that the City accepts the <br /> <br />plantings as installed per the approved landscaping plan. <br />A Pre-Planting meeting with City Staff shall occur onsite, prior to any installation of <br /> <br />boulevard trees. Contractor shall contact the City at least forty-eight (48) hours in <br />advance to schedule this meeting. <br />Sidewalks shall have alternating brush strokes per panel (see City specification). <br /> <br />Once the Landscape Plan is approved by the City, there shall be no modifications to the <br /> <br />Plant Schedule without first obtaining approval of the City. <br /> <br />{ŷĻĻƷ \[Њ͵Њ: <br />Only prune out dead/broken/misshapen branches. <br /> <br />Boulevard trees shall not have branching beginning at a height less than six (6) feet from <br /> <br />grade. <br />Boulevard areas shall be irrigated as well. <br /> <br />Irrigation system must be equipped with both a rain sensor and at least one water <br /> <br />efficient technology such as soil moister sensor(s), smart controller, ET sensor, etc. <br /> <br /> <br /> <br /> <br /> <br />