My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Environmental Policy Board - 12/18/2017
Ramsey
>
Public
>
Agendas
>
Environmental Policy Board
>
2017
>
Agenda - Environmental Policy Board - 12/18/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 11:53:56 AM
Creation date
12/27/2017 4:00:45 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Environmental Policy Board
Document Date
12/18/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTES <br />1.REFER TO SHEET C1.41, GRADING AND DRAINAGE PLAN, FOR GENERAL NOTES.12.ALL PIPE WITH NO SIZE LABEL SHALL BE 1". <br />LEGEND <br />2.IRRIGATION SYSTEM IS DESIGNED FOR 60(+/-) PSI AT THE BASE OF HEADS ON 'POND SYSTEM'13.ALL SPRINKLERS SHALL BE AS NOTED ON LEGEND. <br />AND 50(+/-) PSI AT THE BASE OF HEADS ON 'BUILDING SYSTEM'. NOTIFY <br />69,500 SF / 8.5 ACRES) <br />LIMITS OF IRRIGATED AREA - POND SYSTEM (3 <br />ENGINEER/LANDSCAPE ARCHITECT IF EXISTING PRESSURE DIFFERS.14.ADJUST HEADS FOR GRADE, AS NECESSARY, AFTER GRASS HAS BEEN ESTABLISHED AND <br />ALL SETTLEMENT AT HEADS HAS OCCURRED. <br />LIMITS OF IRRIGATED AREA - BUILDING SYSTEM (70,000 SF / 1.6 ACRES) <br />3.WATER SOURCE FOR POND SYSTEM: WATER WILL BE AVAILABLE FROM PROPOSED 4" <br />CAPPED FLANGE FROM THE POND PUMP STATION15.ALL RISERS, BACKFLOW PREVENTORS AND HOSE BIBS SHALL BE SET PLUM. SPRINKLER <br />HEAD RISERS, QUICK COUPLER VALVES AND ALL VALVES WITH STEMS SHALL BE SET <br />4.WATER SOURCE FOR THE BUILDING SYSTEM (ZONES 33-49): WATER WILL BE AVAILABLEPERPENDICULAR TO FINISHED GRADE. <br />FROM PROPOSED 2" CAPPED FLANGE INSIDE THE MECHANICAL ROOM. <br />16.CONTROL VALVE WIRES SHALL BE #14 GAUGE U.F.U.L. JACKETED DECODER CABLE <br />5.LAYOUT WORK AS ACCURATELY AS POSSIBLE. THE CONTRACTOR MAY MAKE MINORAPPROVED DIRECT BURIAL. UNDERGROUND CONNECTIONS SHALL BE MADE WITH 3-M WIRE <br />ADJUSTMENTS TO THE LOCATION AND SPACING AS NECESSARY TO ACCOMMODATE ACTUALCONNECTORS (DBY), OR APPROVED EQUAL. <br />FIELD CONDITIONS. HEAD LOCATIONS SHALL BE FLAGGED AND REVIEWED BY THE ENGINEER <br />PRIOR TO INSTALLATION.17.PLACE ALL VALVES IN APPROVED VALVE BOXES. <br />6.COORDINATE INSTALLATION WITH THE WORK OF OTHERS.18.CONDUCT PERFORMANCE TEST IN THE PRESENCE OF OWNER AND LANDSCAPE ARCHITECT <br />FOLLOWING COMPLETION OF SYSTEM INSTALLATION. <br />7.ALL MATERIALS SHALL BE INSTALLED AS DETAILED ON DRAWINGS, HOWEVER, IF THE <br />CONTRACT DRAWINGS AND/OR SPECIFICATIONS DO NOT THOROUGHLY DESCRIBE THE19.CONDUCT AND DEMONSTRATE TO OWNER THE WINTERIZATION AND SPRING START-UP <br />PROCESS IN THE FALL OF COMPLETION. <br />METHOD OR TECHNIQUES TO BE USED, THE CONTRACTOR SHALL FOLLOW THE INSTALLATION <br />METHODS ISSUED BY THE MANUFACTURER . ALL SUCH LITERATURE MUST BE SUBMITTED 48 <br />LANDSCAPE ARCHITECTURE SITE PLANNING CIVIL ENGINEERING <br />HOURS PRIOR TO INSTALLATION FOR REVIEW AND APPROVAL BY THE ENGINEER.20.IRRIGATION CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL EQUIPMENT NECESSARY TO 7575 GOLDEN VALLEY ROAD <br /> SUITE 200 MINNEAPOLIS. MN 55427 <br />FAX (763) 544-0531 PH (763) 544-7129 <br />MAKE THE SYSTEM FULLY FUNCTIONAL. <br />8.CHECK AND VERIFY ALL EXISTING AND PROPOSED SITE CONDITIONS, UTILITIES AND SERVICES <br />21.IRRIGATION CONTRACTOR TO COORDINATE WITH CONSTRUCTION MANAGER TO PROTECT <br />PRIOR TO TRENCHING. <br />EXISTING UTILITIES. <br />9.LATERAL PIPING SHALL BE A MINIMUM OF 12 INCHES DEEP AND MAINLINE PIPING A MINIMUM <br />OF 18 INCHES DEEP. ENGINEER SHALL BE NOTIFIED TO VERIFY TRENCH DEPTHS BEFORE22.PER CITY CODE, THE IRRIGATION SYSTEM SHALL UTILIZE TECHNOLOGY THAT INHIBITS OR <br />BACKFILLING.INTERRUPTS OPERATION OF THE IRRIGATION SYSTEM DURING PERIODS OF SUFFICIENT <br />OBTAIN EASEMENT FOR UTILITY. <br />MOISTURE. AS DETAILED, SOIL MOISTURE SENSORS SHALL BE INTEGRATED INTO THE <br />COORDINATE INSTALLATION OF SANITARY <br />10.ALL MAINLINE PIPING SHALL BE PVC (SDR 21/ CLASS 200). LATERAL LINE PIPING FOR BALLSEWER WITH HOME OWNER. PROVIDESYSTEM. ALTERNATIVES MAY INCLUDE WEATHER-BASED IRRIGATION CONTROLLER(S), <br /> <br />TEMPORARY DRIVEWAY TO ALLOW <br />FIELDS SHALL BE PVC (SDR 26 / 160 PSI).AND/OR EVAPO-TRANSPIRATION (ET) SENSORS. <br />CONTINUOUS ACCESS TO/ FROM HOUSE. <br />4"x4" AREA - FOR CITY PURPOSES <br />11.ALL MAIN LINE PIPING AND LATERAL PIPE of 1-1/2" AND LARGER AT AREAS OUTSIDE OF BALL <br />FIELDS SHALL BE PVC (SDR 26 / CLASS 160). <br />10' TRAIL <br />16.5' WETLAND <br />SETBACK (TYPICAL) <br />BUS CORRAL/ HARD SURFACE PLAY / EVENT PARKING <br />SOFT PLAY <br />(3-5) <br />02040 <br />PRE-K <br />PLAY <br />SOFT PLAY <br />(K-2) <br />16.5' WETLAND <br />SERVICE AREA <br />SETBACK (TYPICAL) <br />MECHANICAL <br />NEW RAMSEY <br />ELEMENTARY <br />SCHOOL <br />SOFTBALL FIELD 1 <br />FIRE LANE <br />OPEN PLAY AREA <br />STORMWATER POND <br />DROP-OFF <br />PARKING (153 STALLS) <br />SOFTBALL FIELD 2 <br />02040 <br />STORAGE/ <br /> <br />