Laserfiche WebLink
5.03: Review Sketch Plan for Pearson Place (Project No. 16-31a); Case of John Dobbs. <br />Presentation <br />City Planner Anderson presented the staff report stating the purpose of this case is to review the <br />official Sketch Plan, prepared by Otto Associates and dated May 4, 2017, for a proposed twelve <br />(12) lot residential subdivision near the southern/eastern end of Bowers Drive. The Sketch Plan <br />Review process affords the Planning Commission to opportunity to provide early direction on the <br />layout of the proposed plat, before the Developer prepares detailed Preliminary Plat plans. A key <br />decision will occur at Preliminary Plat, in which the layout will be approved, subject to approving <br />final construction plans and Final Plat documents. At that time, the City will review items <br />including, but not limited to, Grading Plan, Utility Plan, Landscape Plan, and Street Light Plan. It <br />was noted the City hosted two (2) public workshops regarding a concept plan for this project in <br />2016. Comments from attendees of those workshops was reviewed with the Commission. Staff <br />reviewed the request in further detail and requested feedback from the Commission on the sketch <br />plan for Pearson Place. <br />Commission Business <br />Commissioner Anderson stated he supported the concept and believed this was a nice addition. <br />He suggested Outlot C be flattened out to allow for better access in the case of an emergency <br />during construction. <br />Commissioner Nosan requested further information on the buffer. <br />City Planner Anderson described the location of the 50-foot buffer that is behind the existing <br />homes along Bowers Drive to provide a buffer for them from potential future development of the <br />adjacent agricultural land. <br />Commissioner VanScoy believed the buffer was very generous. He questioned how the City <br />would address street damage that may occur during construction. <br />City Planner Anderson stated this issue would have to be addressed with the applicant. He noted <br />an escrow could be requested from the applicant by the City and the amount could be reduced over <br />time as the lots develop. <br />Community Development Director Gladhill reported the applicant has been working with the City <br />Engineer on a surety for construction damage. <br />John Dobbs, Pearson Place developer, discussed his development in further detail and thanked the <br />Commission for their feedback. He discussed the proposed lot depths for both sides of the street. <br />He clarified he would not be controlling the future of Outlot C and then discussed the grading that <br />would occur within the development for the retention ponds. He explained he would work to <br />install 12 driveways without removing significant trees from the proposed lots. <br />Commission VanScoy asked what the capacity of Bowers Drive was. <br />