Laserfiche WebLink
Ramsey will evolve through citizen -driven, collaborative procets that respect the balance and connectivity between its unique urban, rural, and natural <br />environment for current and inure generations. <br />Improve the safety and mobility of <br />major corndors <br />Create a Master Plan for Lake Itasca 2019 <br />Park (note: significant development <br />occurring in area). <br />Create a Master Plan for Community 2020 <br />Park #6 <br />Complete a Comprehensive 2018 <br />Transportation Plan <br />Complete the Ramsey Highway 10 2018 <br />Plan (extension of the Highway 10 <br />Access Planning Study and Greater <br />Minnesota Gateway Imtiattve) <br />Complete a Comdor Plan for 2019 <br />Highway 47 and Highway 5 <br />(combined) <br />Complete a Corridor Plan for the <br />Green Valley Road East/West <br />Corridor <br />2020 <br />Create a Corridor Plan for Armstrong <br />Boulevard <br />Explore options for revising the City's <br />sidewalk pohcy, including requiring <br />sidewalks or trails on both sides of <br />some new pubhc streets, different <br />standards for pubhc versus private <br />roads, high -volume versus low - <br />volume roads, and issues related to <br />long-term maintenance. <br />2021 <br />vestment and ongoing maintenance <br />obli ytions. <br />A well-connected parks and <br />recreation system for the area west of <br />Armstrong Boulevard along Bunker <br />Lake Boulevard due do new growth. <br />A well-connected parks and <br />recreation system for the area north <br />of Trott Brook near the Brookfield <br />neighborhood for existing and future <br />neiehborh oods. <br />A plan for prioritization, concept <br />design, and funding for key corridors <br />creates a safe and efficient <br />transportation syste ; <br />A plan for prioritization, concept <br />design, and funding for key corndors <br />creates a safe and efficient <br />transportation stem. <br />A plan for prioritization, concept <br />design, and funding for key corridors <br />creates a safe and efficient <br />transportation system. <br />A plan for pnoritization, concept <br />design, and funding for key corridors <br />creates a safe and efficient <br />transportation system, including a <br />network a tradr and should improvement. <br />A plan for prioritization, concept <br />design, and funding for key corridors <br />creates a safe and efficient <br />transportation system, including noise <br />itiyation. <br />Walkable Neighborhoods <br />$10,000 in professional services. <br />$10,000 in professional services. <br />No additional resources needed. Plan <br />is already in development. <br />TBD — a quote has been request of <br />Bolton and Menk, Inc. (firm that <br />completed the original Highway 10 <br />Access Pl mnasr Study). <br />TBD — professional services. <br />Estimate = $50,000. <br />TBD — professional services. <br />Estimate = $25,000. <br />TBD — professional services. <br />Estimate = $25,000. <br />Ensure the Comprehensive Plan <br />continues to implement the City's <br />Mission and Vision while respecting <br />market forces. <br />Complete The COR Development <br />Plan Update <br />2018 <br />The development of The COR <br />balances high -quality vision with <br />City of Ramsey 2040 Comprehensive Plan Update <br />Land Use Plan <br />Page 5of31 <br />No additional resources necessary. <br />Plan is already in development. <br />