Laserfiche WebLink
Figure 6-9 of the TPP <br />Increased Revenue Scenario Transitways <br />Building an Accelerated Transitway Vision <br />Reference Items <br />Principal Arterial Highways <br />Other Trunk Highways <br />Lakes and Rivers <br />City Boundary <br />County Boundary <br />2940 Urban Service Area <br />MPO Area <br />Carver <br />Sh7rburne <br />Hennepin <br />Pen, P.vs <br />2 Chicago: Er, er's1 <br />-.crow iSt Ave <br />3 N'osra tad'.bay to <br />4 =„411 <br />Herne.z�f+se <br />Scott <br />Midtown <br />men en alvd <br />0 5 10 20 Milos <br />t i i r M <br />JNorthstar Line <br />"/ Blue Line <br />*Nap Green Line <br />O Red Line <br />Orange Line <br />Gold Line <br />Accelerated <br />Arterial BRT <br />Accelerated Transitways <br />under study <br />mode and alignment <br />not yet specified <br />Regional Multimodal Hub <br />East [h 2r <br />Dakota <br />Nov 2014 <br />Increased Revenue Scenario would <br />also include at least 1% average <br />annual bus expansion. <br />Page - 17 12015 SYSTEM STATEMENT — RAMSEY <br />TRANSPORTATION <br />