Laserfiche WebLink
Review File: Motors on 10 Parking Lot Expansion <br />Construction Plans for Site Grading and Parking Lot and Miscellaneous Construction <br />Engineering Review <br />August 28, 2017 <br />Page 2 of 2 <br />Stormwater Management Plan <br />1. The Drainage Diagram numbers are reversed on HydroCAD, start over with report and <br />map number lines. <br />2. The pond area scaled from the plans is < 10% of the HydroCAD area. <br />3. Need MIDS Calculation for infiltration. <br />4. A soil boring is required in the infiltration basin to a depth 15 feet below the surface. <br />5. The perforated pipe, infiltration trench, is not in the model. <br />**Please return annotated review sheet documenting changes** <br />