STORM WATER
<br />POLLUTION PREVENTION
<br />PLAN (SWPPP)
<br />BUNKER LAKE INDUSTRIAL PARK
<br />CITY OF RAMSEY
<br />ANOKA COUNTY, MINNESOTA
<br />UNIVERSITY OP MINNESOTA
<br />AlanMaxwell
<br />ConsWr1an Installer (May 31 )
<br />Construction site Management (May Mao 31 3, 20201
<br />DaalBn of Construction SWPPP (May 31 2020)
<br />OW OF RAMSEY
<br />ANOKA COUNTY, MINNESOTA
<br />RESPONSIBLE PARTIES
<br />The Contractor a. Owner must apply for
<br />required by the System PDES)Pw m begin Pollutant onmmatons
<br />automatically] calendar after the postinaked aateofa complereappl�catwn [Longer
<br />time formes applyto sresthat disturb a g terthansoacres]nt
<br />The Contractor shall prov. one or more trained Construction SWPPP ger(n)mknowledgtion of gea SWPPP, a. the installation, inspection
<br />of erosion prevention a. sediment conreol 13MPs that will oversee the
<br />Installer(s)
<br />The Contractor shall provide one or more train.BMP Tn rwill mand/or supervise the mstalatmn,
<br />maintenance and repair of eMPS At least ore individual on protect must betrain. ln Meese poll dunes
<br />OWNER
<br />SWPPP DESIGNER
<br />CONMACTOR
<br />CONSTRUCTION SWPPP MANAGER
<br />PARTY RESPONSIBLE FOR LONG TERM O&M
<br />COMPANY
<br />TBD
<br />TOD
<br />CONTACT PERSON
<br />Malt Kiker
<br />Alan Maxwell, P E
<br />Matt Kuker
<br />PHONE
<br />763-427-5955
<br />763-433-2851
<br />763-427-5955
<br />SWPPP
<br />The .PPP Designer and Construction .PPP Manager must have appropr aini g Documentation showing t aining
<br />commensurate with the job duties a. respon -bilities is required to he included in Me SWPPP prior to any wo. beginning on the
<br />site Training documentation for the SWPPP Designer E incl.. on this sheet The Co tractor shall attach training documentation to
<br />ROTrlea for
<br />Construction
<br />mtructn SWPPP Managerconstruct.panic to the start of construct. The information shall be kept u to dare until the
<br />od
<br />ADDRIONAL COMPENSATION
<br />Payment for all work associat. with Erosion a. Sediment Control shall he as desciih. in the Pro, Manual Unless
<br />authorized by Me Owner no additional payment shall he made tor
<br />Asecdtiivient control incoliance with the Minnesota Pollution
<br />administer
<br />maintain the site
<br />rol Agent'/MPCA)-O traction
<br />mtv(MN 00001)mrc hmntea to inspection,maintenance, and removal ofDMPs or addition of BM Ps to
<br />SPECIAL „ as an environmenta/ review required.. this projector any part or a common plan ofaevempment or sale
<br />1)includes
<br />2) debrcan Portion of the site have the potential to affect threatened or endangered species orthenr critical
<br />3) Does any portion ofthesite anx rg aCabreous fen
<br />n) knownomtionereaarch o,o R properties lUed on the National Register ofwstortc viacesora
<br />5) Have any Karst features have been Hennfuw in the protect vlclnRyt
<br />6) s compliance with temporary or permanent smrmwater management g requirements infeasible for
<br />Prole,
<br />et Has the MN spawning,ONR work in water restrnmnsfor any Publere war this site arg during fish
<br />NO
<br />NO
<br />NO
<br />NO
<br />NO
<br />NO
<br />NO
<br />LEGEND
<br />PROJECT BOUNDARY
<br />PROJECT AREAS.
<br />ota rolese(disturb. area), 2 ACRES
<br />EX., area of impervious surface = 0 0 ACRES
<br />Total new impervtous surface area creat.= 9 4 ACRES
<br />Planned Construction Start Dare 07/25/2017
<br />Estimated Construction Completion Date 08/31/2018
<br />PERMANENT STORMWATER MANAGEMENT SYSTEM
<br />Type. storm water management us. a more than 1 acre of new impervious surface is created
<br />% Peegr mmaMntstorm Water Management Plot 'required
<br />PROJECT LOCATION
<br />COUNTY
<br />ANOKA
<br />TOWNSHIP
<br />13MP SUMMARY
<br />SILT FENCE, TYPE MS
<br />STORM DRAIN INLET PROTECTION
<br />SEDIMENT CONTROL LOG
<br />EROSION CONTROL BLANKETS CATEGORY 3
<br />RANGE
<br />SECTION
<br />LATITUDE
<br />QUANTITY
<br />2810
<br />27
<br />180
<br />7200
<br />UNIT
<br />LIN FT
<br />EACH
<br />LUMP SUM
<br />DESCRIPTION OF CONSTRUCTION ACTIVII1ES AND STORMWATER MANAGEMENT
<br />Construction activities include Tree removal,. grading, Constructing sanitary sewer, Constructing watermain,
<br />Constructingstorrn sewer, Constructing concrere curb & gutter, Constructing bituminous roadway, Conso-treting
<br />bituminous parking lot, Constructing a wet sedimentation basin a. drainage ditch, Temporary erosion a. sediment
<br />control, a. Permanent stabilIzaton
<br />The Bunker Lake Industnal Park project will include constructing new underground utilities, roaaways,curbs gutter,
<br />northernand parking lots to facilitate future
<br />the exEting drainage gathers in ditches, either along Bunker Lake Boulevard to the no. or along the ONSF railroad
<br />to the south Drainage a. storm water treatment will be gathered f rorn Me roadways a. parking into curb &
<br />gutter a. drain to catch basins The catch basins will gaMer via storm sewer and outlet to a wet sedimentation basin
<br />in the southwest corner of Me.. After
<br />gaMered in the wet se.rnentation basin, water will he allow..
<br />across the western a. edgeoflheuildings The existing drainage gaMers within the site in various areas. Some of
<br />drain
<br />overflow into a cuNertand site, ilhere it ultimateThe new ditch tinfiltratell alkiw warer to ultimately drain o two ex., 29X 45. arch pipes
<br />Mat cross Bunker Lake Boulevard a. empty north& the..
<br />DOCUMENT RETENTION
<br />The following documentation wIll he retain. for a peretl of not less than 3-years from the dated submittal of Me
<br />GENERAL STORMWATER DISCHARGE REQUIREMENTS NOT in compliance with Part III E of the Permit
<br />All requirements IEt. in Part III of Me Pennetrer the design of the permanent storrnwater management system and discharge 1 The final SWPPP
<br />have been included in Me preparation of ME SWPPP These include but are not rceato 2 Copies of all stormwater relat. permits required for Me pro,
<br />1 The expect. amount ue try, and durabon of preapitation 3 Records of all inspection and maintenance conduct. during construction
<br />2 The nature. sto n at the sae 4 Copies of all permanent operation and maintenance agreements, including all right-of-way, contracts,
<br />3 Peak flow rates and stor mes to minim. erosion at outlets and downstream channel and stream bank erosion coven.. a. other bi.ing requirements regarding perpetual maintenance,.
<br />4 The range of soil particle sues ex ed to be present on the sr. 5 All required calculattons for design& the temporary a. permanent BMPs
<br />BOLTON
<br />& MENK
<br />RECEIVING WATERS
<br />Receiving waters, , wetlands, Public Waters, and stormwater ponds, are identifi. on the USGS 7 5 min quad map
<br />within.. mile of Me protect boundary surface rReceiving
<br />BMPs relative to construction activities IEt. in thE permitfor special a. impair. waters have been incorporat. into this plan All
<br />specific 13MPs list. in approv. TMOLs and those 131APs list. for construction relat. waste load allocations have also been freomorated
<br />NAME OF WATER BODY
<br />MISSISSIPPI RIVER
<br />Impairmenre MERCURY
<br />wet1Z1,etc) SPecal Water] 1 USEPa
<br />RIVER YES V'C'CITI;T'R VE'C'CIT1TSTF°R
<br />IMPLEMENTATION hallnrclnde any rep1e1ted charges to the SWPPP, including but no ited to.
<br />Train. Personnel, Locations f r
<br />Concrete
<br />Sanitation
<br />es and
<br />cations of E rosto
<br />S.ment Control Failure. submit Stockpiles,
<br />tess shall he consaeren acceptanceofthe swvvv as designed with no changes
<br />2) Install perimeter
<br />, and construction exit
<br />ofRough grade..
<br />them cot na drainage t�hnInstall se.rnent control to ensure sediment does not leave site via the
<br />newly construct. ditch
<br />5) Construct bituminous roadway , parking, and building areas
<br />E) Insoll inlet protetton on newly consaucteacot1 basins
<br />7) Stabilize..
<br />sit Add addifional temporary BM Ps as necessary during construction bases on inspection reports
<br />zit Ensure final stabilization meas res are complete
<br />10) Subma Nonce ofTermination (NOT).MPCA within 30 days offinal stabilization
<br />!.==-"="® :w"%.out=®=W:` 7,7 I PSD, LLC. RAMSEY, MINNESOTA
<br />I BUNKER LAKE INDUSTRIAL PARK
<br />7,7 I STORM WATER POLLUTION PROTECTION PLAN
<br />I C2.01