Laserfiche WebLink
STORM WATER <br />POLLUTION PREVENTION <br />PLAN (SWPPP) <br />BUNKER LAKE INDUSTRIAL PARK <br />CITY OF RAMSEY <br />ANOKA COUNTY, MINNESOTA <br />UNIVERSITY OP MINNESOTA <br />AlanMaxwell <br />ConsWr1an Installer (May 31 ) <br />Construction site Management (May Mao 31 3, 20201 <br />DaalBn of Construction SWPPP (May 31 2020) <br />OW OF RAMSEY <br />ANOKA COUNTY, MINNESOTA <br />RESPONSIBLE PARTIES <br />The Contractor a. Owner must apply for <br />required by the System PDES)Pw m begin Pollutant onmmatons <br />automatically] calendar after the postinaked aateofa complereappl�catwn [Longer <br />time formes applyto sresthat disturb a g terthansoacres]nt <br />The Contractor shall prov. one or more trained Construction SWPPP ger(n)mknowledgtion of gea SWPPP, a. the installation, inspection <br />of erosion prevention a. sediment conreol 13MPs that will oversee the <br />Installer(s) <br />The Contractor shall provide one or more train.BMP Tn rwill mand/or supervise the mstalatmn, <br />maintenance and repair of eMPS At least ore individual on protect must betrain. ln Meese poll dunes <br />OWNER <br />SWPPP DESIGNER <br />CONMACTOR <br />CONSTRUCTION SWPPP MANAGER <br />PARTY RESPONSIBLE FOR LONG TERM O&M <br />COMPANY <br />TBD <br />TOD <br />CONTACT PERSON <br />Malt Kiker <br />Alan Maxwell, P E <br />Matt Kuker <br />PHONE <br />763-427-5955 <br />763-433-2851 <br />763-427-5955 <br />SWPPP <br />The .PPP Designer and Construction .PPP Manager must have appropr aini g Documentation showing t aining <br />commensurate with the job duties a. respon -bilities is required to he included in Me SWPPP prior to any wo. beginning on the <br />site Training documentation for the SWPPP Designer E incl.. on this sheet The Co tractor shall attach training documentation to <br />ROTrlea for <br />Construction <br />mtructn SWPPP Managerconstruct.panic to the start of construct. The information shall be kept u to dare until the <br />od <br />ADDRIONAL COMPENSATION <br />Payment for all work associat. with Erosion a. Sediment Control shall he as desciih. in the Pro, Manual Unless <br />authorized by Me Owner no additional payment shall he made tor <br />Asecdtiivient control incoliance with the Minnesota Pollution <br />administer <br />maintain the site <br />rol Agent'/MPCA)-O traction <br />mtv(MN 00001)mrc hmntea to inspection,maintenance, and removal ofDMPs or addition of BM Ps to <br />SPECIAL „ as an environmenta/ review required.. this projector any part or a common plan ofaevempment or sale <br />1)includes <br />2) debrcan Portion of the site have the potential to affect threatened or endangered species orthenr critical <br />3) Does any portion ofthesite anx rg aCabreous fen <br />n) knownomtionereaarch o,o R properties lUed on the National Register ofwstortc viacesora <br />5) Have any Karst features have been Hennfuw in the protect vlclnRyt <br />6) s compliance with temporary or permanent smrmwater management g requirements infeasible for <br />Prole, <br />et Has the MN spawning,ONR work in water restrnmnsfor any Publere war this site arg during fish <br />NO <br />NO <br />NO <br />NO <br />NO <br />NO <br />NO <br />LEGEND <br />PROJECT BOUNDARY <br />PROJECT AREAS. <br />ota rolese(disturb. area), 2 ACRES <br />EX., area of impervious surface = 0 0 ACRES <br />Total new impervtous surface area creat.= 9 4 ACRES <br />Planned Construction Start Dare 07/25/2017 <br />Estimated Construction Completion Date 08/31/2018 <br />PERMANENT STORMWATER MANAGEMENT SYSTEM <br />Type. storm water management us. a more than 1 acre of new impervious surface is created <br />% Peegr mmaMntstorm Water Management Plot 'required <br />PROJECT LOCATION <br />COUNTY <br />ANOKA <br />TOWNSHIP <br />13MP SUMMARY <br />SILT FENCE, TYPE MS <br />STORM DRAIN INLET PROTECTION <br />SEDIMENT CONTROL LOG <br />EROSION CONTROL BLANKETS CATEGORY 3 <br />RANGE <br />SECTION <br />LATITUDE <br />QUANTITY <br />2810 <br />27 <br />180 <br />7200 <br />UNIT <br />LIN FT <br />EACH <br />LUMP SUM <br />DESCRIPTION OF CONSTRUCTION ACTIVII1ES AND STORMWATER MANAGEMENT <br />Construction activities include Tree removal,. grading, Constructing sanitary sewer, Constructing watermain, <br />Constructingstorrn sewer, Constructing concrere curb & gutter, Constructing bituminous roadway, Conso-treting <br />bituminous parking lot, Constructing a wet sedimentation basin a. drainage ditch, Temporary erosion a. sediment <br />control, a. Permanent stabilIzaton <br />The Bunker Lake Industnal Park project will include constructing new underground utilities, roaaways,curbs gutter, <br />northernand parking lots to facilitate future <br />the exEting drainage gathers in ditches, either along Bunker Lake Boulevard to the no. or along the ONSF railroad <br />to the south Drainage a. storm water treatment will be gathered f rorn Me roadways a. parking into curb & <br />gutter a. drain to catch basins The catch basins will gaMer via storm sewer and outlet to a wet sedimentation basin <br />in the southwest corner of Me.. After <br />gaMered in the wet se.rnentation basin, water will he allow.. <br />across the western a. edgeoflheuildings The existing drainage gaMers within the site in various areas. Some of <br />drain <br />overflow into a cuNertand site, ilhere it ultimateThe new ditch tinfiltratell alkiw warer to ultimately drain o two ex., 29X 45. arch pipes <br />Mat cross Bunker Lake Boulevard a. empty north& the.. <br />DOCUMENT RETENTION <br />The following documentation wIll he retain. for a peretl of not less than 3-years from the dated submittal of Me <br />GENERAL STORMWATER DISCHARGE REQUIREMENTS NOT in compliance with Part III E of the Permit <br />All requirements IEt. in Part III of Me Pennetrer the design of the permanent storrnwater management system and discharge 1 The final SWPPP <br />have been included in Me preparation of ME SWPPP These include but are not rceato 2 Copies of all stormwater relat. permits required for Me pro, <br />1 The expect. amount ue try, and durabon of preapitation 3 Records of all inspection and maintenance conduct. during construction <br />2 The nature. sto n at the sae 4 Copies of all permanent operation and maintenance agreements, including all right-of-way, contracts, <br />3 Peak flow rates and stor mes to minim. erosion at outlets and downstream channel and stream bank erosion coven.. a. other bi.ing requirements regarding perpetual maintenance,. <br />4 The range of soil particle sues ex ed to be present on the sr. 5 All required calculattons for design& the temporary a. permanent BMPs <br />BOLTON <br />& MENK <br />RECEIVING WATERS <br />Receiving waters, , wetlands, Public Waters, and stormwater ponds, are identifi. on the USGS 7 5 min quad map <br />within.. mile of Me protect boundary surface rReceiving <br />BMPs relative to construction activities IEt. in thE permitfor special a. impair. waters have been incorporat. into this plan All <br />specific 13MPs list. in approv. TMOLs and those 131APs list. for construction relat. waste load allocations have also been freomorated <br />NAME OF WATER BODY <br />MISSISSIPPI RIVER <br />Impairmenre MERCURY <br />wet1Z1,etc) SPecal Water] 1 USEPa <br />RIVER YES V'C'CITI;T'R VE'C'CIT1TSTF°R <br />IMPLEMENTATION hallnrclnde any rep1e1ted charges to the SWPPP, including but no ited to. <br />Train. Personnel, Locations f r <br />Concrete <br />Sanitation <br />es and <br />cations of E rosto <br />S.ment Control Failure. submit Stockpiles, <br />tess shall he consaeren acceptanceofthe swvvv as designed with no changes <br />2) Install perimeter <br />, and construction exit <br />ofRough grade.. <br />them cot na drainage t�hnInstall se.rnent control to ensure sediment does not leave site via the <br />newly construct. ditch <br />5) Construct bituminous roadway , parking, and building areas <br />E) Insoll inlet protetton on newly consaucteacot1 basins <br />7) Stabilize.. <br />sit Add addifional temporary BM Ps as necessary during construction bases on inspection reports <br />zit Ensure final stabilization meas res are complete <br />10) Subma Nonce ofTermination (NOT).MPCA within 30 days offinal stabilization <br />!.==-"="® :w"%.out=®=W:` 7,7 I PSD, LLC. RAMSEY, MINNESOTA <br />I BUNKER LAKE INDUSTRIAL PARK <br />7,7 I STORM WATER POLLUTION PROTECTION PLAN <br />I C2.01 <br />