My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 08/03/2017
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2017
>
Agenda - Planning Commission - 08/03/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:28:44 AM
Creation date
12/28/2017 9:28:33 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
08/03/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
district, based on the request for a Zoning and Comprehensive Plan Amendment. The Sketch Plan appears to <br />comply with the standards specified for this zoning district. There appears to be no improvements proposed in Lot 1 <br />(the 34.49 acre lot). It is staffs opinion that Lot 1 should be recorded as an outlot (until improvements are proposed) <br />and "Lot 2" be renamed Lot 1. Staff suggests that the Lot 2 west property line be moved to fully include the <br />driveway so that the driveway complies with side setback requirements. Specifics are outlined in the Staff Review <br />File. <br />Wetlands: <br />There are wetlands on the Subject Property that have been delineated. The Lower Rum River Watershed <br />Management Organization (LRRWMO) has approved a wetland delineation regarding both wetland boundaries and <br />types for the property. Staff notes that the developer must ensure that all wetland setback areas are entirely within <br />proposed drainage and utility easements and show the 16.5 measurement on the plan sheet. <br />Floodplain: <br />Floodplain areas exist within the project are. The are categorized as General Floodplain or Undetermined A Zones, <br />which means that the Base Flood Elevation (BFE) has not been modeled. It does appear that the floodplain <br />boundary is similar to the wetland boundary; however, without a BFE, that cannot be determined. It is staffs <br />recommendation that the project engineer model the BFE. <br />Density Transition: <br />As proposed, the development is not subject to density transitioning standards outlined in City Code Section <br />117-110. <br />Streets and Access: <br />At this time, no new streets have been proposed. Both lots would gain access from 175th Ave NW. <br />Sidewalks/Trails: <br />The Planned Transportation System within the 2030 Comprehensive Plan identifies a proposed Trail along 175th <br />Ave NW. As part of this projet, this will need to be explored further. <br />Grading and Drainage: <br />It does not appear that any grading activity is proposed with this project. If more than one (1) acre of land will be <br />disturbed, a permit from the LRRWMO will be required. <br />Landscaping: <br />Each lot is require to have two (2) front yard trees installed. The plan currently does not show new proposed trees. <br />Deciduous trees shall be at least one (1) inch in diameter and coniferous trees shall be at least five (5) feet in <br />height. Each buildable lot is subject to the City's topsoil requirement. <br />Tree Preservation: <br />At this time, Tree Inventory and Protection plan is not required as it does not appear that any improvements are <br />presently proposed. At such time that Lot 1 (or if revised to an outlot) develops, a Tree Inventory and Preservation <br />Plan will need to be prepared by an ISA Certified Arborist and shall include the total number of (DBH) inches <br />proposed to be removed and total number of (DHB) inches saved. <br />Development Fees: <br />Development Fees will be due with the Plat on lot 1 (lot 2 would be exempt as there is already an existing dwelling <br />on the property) including, but not limited to, Park Dedication, Trail Development, and Storm Water Management. <br />These fees are collected at the time the Final Plat is recorded. As noted previously, it may be more beneficial to plat <br />Lot 1 as an outlot, which would defer the Development Feeds due until such time that land is re -platted to buildable <br />parcel(s). <br />Development Agreement: <br />An executed Development Agreement will be required prior to releasing the plat for recording. An engineer's <br />estimate for public improvements will be required with the submitted final plat. <br />
The URL can be used to link to this page
Your browser does not support the video tag.