Laserfiche WebLink
Review File: Bunker Lake Boulevard Industrial Park <br />Preliminary Plat <br />Engineering Review <br />July 27, 2017 <br />Page 2 of 4 <br />6. Graphic scale must match viewport scale. <br />7. Underlying lines must be broken where they are under text boxes to enhance readability. <br />This project will require a stormwater permit from the Lower Rum River Watershed <br />Management Organization (LRRWMO). <br />G0.01: <br />1. A date must be shown on each page of the set. <br />C0.01 — C0.02: <br />8. A sheet specific legend must be added to each sheet. <br />9. Make all text legible. <br />10. Add note: "All erosion control must be installed and inspected by the City prior to any <br />work commencing on site." <br />C2.03: <br />1. Change "14 days" to "7 days". This site is within 1 mile of the Mississippi River. <br />C2.04- C2.08: <br />1. The intent of the Erosion Control Plan sheets is not clear. The same areas of the site are <br />shown on multiple pages. Notes must be added to clarify intent of pages. <br />2. Add note "Silt fence must be placed around base of stockpile and stabilization installed <br />within 7 days on slopes." <br />3. The cul-de-sac does not match the sketch. <br />4. Utility lines should be screened on the erosion control plan. Match lines are required on <br />all sheets. <br />5. Show screened grading with drainage patterns on Erosion Control Sheets. <br />6. Remove Mulch , Seed mix entry from legend if it is not used on sheet. <br />7. Add "See Page XX" label where features continue off the page. <br />8. Add text mask to hide lines under labels. <br />9. All items curb, striping, storm sewer, etc., must be in lighter shades on the erosion control <br />plan. See general comment 5. <br />10. Legend must show all items pertinent to each sheet. Fiber blanket in legend does not match <br />plan view. <br />11. Stabilized construction exit is in legend, not on plans. <br />12. Silt fence must be placed downslope of all disturbed areas. <br />C2.09: <br />1. A legend is required on each sheet. <br />2. Why is a concrete intersection proposed? <br />3. Are curb cuts proposed for the north side of the east -west street? <br />C3.01: <br />