My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/09/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 01/09/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:43:04 PM
Creation date
1/10/2018 12:07:03 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/09/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
744
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. EXECUTIVE SUMMARY <br />City Improvement Project 18-03 proposes to complete 2-inch bituminous pavement overlay <br />improvements to numerous public street segments within the City of Ramsey, including other <br />associated appurtenant improvements as outlined in this report. Approximately 63,449 square <br />yards of public streets in several areas of the City are proposed to receive bituminous pavement <br />overlay improvements in 2018. The street segments proposed to receive overlay improvements <br />include the neighborhoods of; Woodland Green, The North Forty 2" d, The North Forty 3rd <br />Northfork Itasca Shores, Northfork, Northfork 2" d, Northfork 3rd, and Northfork Oaks. <br />Appendix A includes an overall project location map, as well as exhibits showing the individual <br />project areas. <br />City staff typically rates the pavement sections of all city streets on an annual basis using the <br />Pavement Surface Evaluation and Rating (PASER) system. The latest PASER rating for each <br />street segment proposed to receive an overlay with this project is included in the street segments <br />summary found in Appendix B. <br />On October 24, 2017, the Ramsey City Council ordered this feasibility report which explores the <br />necessity, feasibility and cost-effectiveness of the proposed improvements by examining the <br />scope of the improvements, exploring estimated costs and available funding sources, defining a <br />preliminary project schedule, and determining whether the improvements should be completed as <br />proposed or in connection with another improvement. <br />The engineer's opinion of probable costs for this project is $585,460.78. Estimated costs include <br />5% contingency costs, plus 14% indirect costs for administrative, engineering, finance and legal <br />costs. <br />The improvements proposed with this project are identified in the City's current 10-year Capital <br />Improvement Program, and can be funded using a combination of General Obligation Street <br />Reconstruction and Overlay Plan bond funds, special assessments to benefiting properties, and <br />utility enterprise funds. Appendix C includes a detailed opinion of probable costs, and preliminary <br />assessment rolls and maps. <br />The proposed improvements are necessary, feasible, and cost-effective from an engineering <br />standpoint, and can be constructed as proposed herein. The proposed improvements would be <br />most cost-effectively constructed as a separate project and not in connection with other proposed <br />improvements due to the specific nature of the improvements. <br />Feasibility Report <br />2018 Street Overlay Improvements <br />City of Ramsey Project No. 18-03 <br />Page 1 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.